GCB-Final | 6/21/2016 | 6/21/2016 | 6/21/2016 | P | PASS |
Christina Prado
|
|
|
All inspections complete - inspection added to change status only
|
FIRE-Final Inspection | 5/31/2016 | 6/1/2016 | 6/1/2016 | A | PASS |
Katie Marron
|
|
|
Life Safety Pass. Scope of work complete. Permit Finaled
|
GCB-Final | 5/23/2016 | 5/24/2016 | 5/24/2016 | A | PASS |
Dave Hannah
|
|
|
Joe ###-#### - code: 631225*
|
GCB-Final | 5/13/2016 | 5/16/2016 | 5/16/2016 | A | NR |
Jim Sly
|
|
|
Joe ###-#### - code: 631225* Cut off nosing on landing to obtain 11" run. upper 3 tread stairway non compliant.
|
GCB-Final | 3/25/2016 | 3/28/2016 | 3/28/2016 | A | NR |
Jim Sly
|
|
|
Joe ###-#### - code: 631225* Re-built stairway.......Run still approx 1" short......Landings not poured.
|
GCB-Final | 2/25/2016 | 2/26/2016 | 2/26/2016 | A | FAIL |
Mike Jordan
|
|
|
Joe ###-####. North doors require a landings. Stairway to storage above is non compliant. Needs to met IBC 7 inch max rise. 11 inch max run.
|
GCB-Shearwall | 12/17/2015 | 12/18/2015 | 12/18/2015 | A | PASS |
Dave Hannah
|
|
|
Grey ###-#### - Exterior Sheetrock Insp. requested
|
GCB-Framing | 12/3/2015 | 12/3/2015 | 12/3/2015 | P | PASS |
Dave Hannah
|
|
|
Grey ###-####
|
GCB-Shearwall | 11/19/2015 | 11/19/2015 | 11/20/2015 | P | PASS |
Dave Hannah
|
|
|
Shawn ###-####
|
GCB-Framing | 11/16/2015 | 11/17/2015 | 11/17/2015 | A | NR |
Phil Shearer
|
|
|
Shawn ###-####. no plans onsite
|
GCB-Fndatn/slab ins/fld vent | 9/29/2015 | 9/29/2015 | 9/29/2015 | P | PASS |
Dave Hannah
|
|
|
Heron ###-####
|
GCB-Footing | 9/28/2015 | 9/28/2015 | 9/28/2015 | P | PASS |
Jim Sly
|
|
|
Heron ###-####
|