Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberGCB15-00113
StatusFinaled
Name GARDEN CITY
Site Address 3640 N WILLOWBAR WAY
Project NameBLD2015-00113
Customer Number 
ePlanReviewNo
Description
(WATERFRONT COMMUNITY CENTER) (PLAN MODIFICATION TO REMOVE A SET OF STAIRS AND A RAMP THAT ACCESS THE GREENBELT) Pernit for the construction of a new 2,065 sq. ft. on story wood framed club house/multipurpose building which also serves the pool area. The building consists of an 880 sq. ft. multipurpose room, two accessible restrooms, pool equipment room and a 182 sq. ft covered breezeway. All work per the approved plans any notations and the attached engineering. This structure is located in the floodplain and is required to have a finished floor elevation a minimu of one foot above BFE. This building is not fire sprinklered. THIS PERMIT IS ONLY FOR THE COMMUNITY CENTER AND DOES NOT INCLUDE THE POOL. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final7/11/20167/11/20167/11/2016PPASS
DetailsDave Hannah
Bill ###-#### - requested 30min call ahead
GCB-Final7/1/20167/1/20167/1/2016PFAIL
DetailsMike Jordan
Bill ###-#### - requested call ahead. Provide code compliant handrails, remove chain and pad lock from gate and provide code compliant hardware. Flusher in womens restroom nees to be on turning side.
FIRE-Final Inspection6/29/20166/30/20166/30/2016APASS
DetailsKatie Marron
Life Safety Passed
GCB-Energy2/22/20162/22/20162/22/2016PPASS
DetailsDave Hannah
Bill ###-####
GCB-Framing2/17/20162/18/20162/18/2016APASS
DetailsDave Hannah
Beau ###-####
GCB-Shearwall2/16/20162/17/20162/17/2016APASS
DetailsDave Hannah
###-####
GCB-Fndatn/slab ins/fld vent1/7/20161/7/20161/7/2016PPASS
DetailsDave Hannah
Huron ###-#### - requested 1pm insp.
GCB-Footing1/6/20161/6/20161/6/2016PPASS
DetailsJim Sly
Huron ###-#### - requested 1:30p.m. insp.
MTI didi Soil Compaction test
GCB-Footing1/4/20161/4/20161/4/2016PNR
DetailsDave Hannah
Huron ###-####
GCB-Footing12/30/201512/31/201512/31/2015ACANC
DetailsDave Hannah
Huron ###-#### - requested 11a.m. insp.
GCB-Footing12/16/201512/16/201512/16/2015PFAIL
DetailsDave Hannah
Huron ###-#### still to wet
GCB-Footing12/14/201512/14/201512/14/2015PFAIL
DetailsDave Hannah
Huron ###-#### footing is full of water and mud