Permit Information
Permit NumberGCB15-00116
StatusFinaled
Name CM Company
Site Address 10482 W CARLTON BAY DR
Project NameBLD2015-00116
Customer Number 
ePlanReviewNo
Description
(PRIMARY HEALTH) Permit for the construction of a new 5,600 sq. ft. addition to an existing 7,730 sq. ft. Primay health office building with work to include general site work, electrical, plumbing and mechanical. The new addition will include general office areas, a training room and two new restrooms per the approved plans, attached engineering and any notations. This building is fully fire sprinklered for area increase. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final7/19/20167/19/20167/20/2016PPASS
DetailsJim Sly
permit was finaled by mistake-so had to schedule the fire final-now it needs the building final signed off again so the permit will final out
FIRE-Final Inspection7/19/20167/19/20167/19/2016PPASS
DetailsKatie Marron
Fire Life Safety Pass.
GCB-Final7/13/20167/15/20167/15/2016APASS
DetailsJim Sly
Mike ###-#### - PHASE 2
Structural items OK for Phase 2.
GCB-Framing6/23/20166/24/20166/24/2016PDEFR
DetailsMike Jordan
Mike ###-#### - PHASE 2 - IT room framing insp... Ran out of time....
GCB-Framing6/7/20166/8/20166/8/2016APASS
DetailsMike Jordan
Mike ###-#### - PHASE 2. Interior wood framed walls for two new offices, phase 2 ok.
GCB-Final5/24/20165/25/20165/25/2016PPASS
DetailsMike Jordan
Mike ###-#### - FINAL FOR TEMP C OF O. Ok to occupy new addition.
FIRE-Final Inspection5/24/20165/25/20165/25/2016APART
DetailsJim Page
TCO allowed per conversation with Scott Arellano, in office/cubicle area's of new addition. A fire sprinkler permit will be needed for transition area between new addition and existing building (Area does have upright protection, pendant heads still in place from ceiling removal) Training room in new addition cannot be occupied until head coverage issue is addressed with partition wall construction, heads will be too far off of partition wall with current head layout.
GCB-Final5/19/20165/20/20165/20/2016ANR
DetailsJim Sly
Mike ###-#### - FINAL FOR TEMP C OF O
Need Temp from Fire.
GCB-Ceiling Grid5/13/20165/16/20165/16/2016APASS
DetailsJim Sly
Mike ###-####
GCB-Courtesy5/5/20165/6/20165/6/2016ADONE
DetailsMike Jordan
Mike ###-####. Went over requirements for occupying new area.
GCB-Framing4/12/20164/13/20164/13/2016APART
DetailsJim Sly
Mike ###-#### - ceiling framing
Hard lids ....OK.
GCB-Energy3/24/20163/25/20163/25/2016APASS
DetailsJim Sly
Mike ###-####
GCB-Framing3/18/20163/21/20163/21/2016APASS
DetailsJim Sly
framing/cover Brandon ###-#### (if this number does not work then ###-####
GCB-Framing3/15/20163/16/20163/16/2016ANR
DetailsJim Sly
Brian ###-#### - requested call ahead
GCB-Shearwall2/29/20163/1/20163/1/2016APASS
DetailsJim Sly
Mike ###-#### - please inspect roof in addition to shearwall
Exterior wall panel and hold down nailing......OK.
GCB-Fndatn/slab ins/fld vent1/22/20161/25/20161/25/2016APART
DetailsJim Sly
Mike ###-####
OK pending special inspections, tests and approvals.
GCB-Stem wall1/22/20161/25/20161/25/2016APASS
DetailsJim Sly
Mike ###-####
OK pending MTI special inspections, tests and approvals.
GCB-Footing1/20/20161/21/20161/21/2016APASS
DetailsJim Sly
Mike ###-####
OK pending MTI special insp, tests, and approvals.