GCB-Final | 8/22/2016 | 8/22/2016 | 8/22/2016 | P | PASS |
Dave Hannah
|
|
|
MJ ###-#### - requested call ahead-as per Dave Hannah when he did the building final there was no elevator # 1 (only elevator #2)-see plan mod
|
GCB-Final | 8/2/2016 | 8/3/2016 | 8/3/2016 | P | FAIL |
Mike Jordan
|
|
|
MJ ###-#### - requested call ahead. Provide engineering for cable guards. Install cane guard as shown on approved plans. handrail extensions on interior stairs do not meet the minimum 12 inches. Provide hanrails/edge protection on ramp at accessible route.
|
FIRE-Final Inspection | 8/1/2016 | 8/1/2016 | 8/1/2016 | P | PASS |
Katie Marron
|
|
|
Fire life safety complete on ONE stairway and elevator at the far west end.
|
FIRE-Conference | 7/20/2016 | 7/20/2016 | 7/20/2016 | A | DONE |
Katie Marron
|
|
|
Phone discussion with MJ to discuss if notification devices will need to be tested. Told him yes and he is going to coordinate with hotel for a good time.
When performing this final try to final
GCB12-00032 and NAF16-00044
|
GCB-Ceiling Grid | 7/11/2016 | 7/12/2016 | 7/12/2016 | A | PASS |
Dave Hannah
|
|
|
MJ ###-####
|
GCB-Courtesy | 6/3/2016 | 6/3/2016 | 6/3/2016 | P | DONE |
Dave Hannah
|
|
|
Mark ###-#### - need to look at slope of ramp
|
GCB-Framing | 5/26/2016 | 5/26/2016 | 5/27/2016 | P | PASS |
Dave Hannah
|
|
|
Mark ###-#### ok to cover 1 hr fire wall second floor top of wall in attic space
|
GCB-Framing | 5/18/2016 | 5/19/2016 | 5/19/2016 | A | FAIL |
Jim Storey
|
|
|
Mark ###-#### need detail for new 1 hr walls thur roof on top of detail a202/b2//ok to cover east and south walls
|
GCB-Framing | 5/2/2016 | 5/2/2016 | 5/2/2016 | P | PASS |
Dave Hannah
|
|
|
Mark ###-####
|
GCB-Framing | 4/28/2016 | 4/29/2016 | 4/29/2016 | A | PART |
Jim Sly
|
|
|
Mark ###-#### - Roof framing & steel insp for wire mesh - pouring at 10a.m. MTI looking at Concrete. Roof framing not ready.
|
GCB-Stem wall | 3/3/2016 | 3/4/2016 | 3/4/2016 | A | FAIL |
Phil Shearer
|
|
|
MJ ###-#### Provide aproved changes to colunms
|
GCB-Stem wall | 2/29/2016 | 3/1/2016 | 3/1/2016 | P | PASS |
Dave Hannah
|
|
|
Mark ###-#### - Rebar Insp. - requested 2p.m. insp. ftgs
|
GCB-Stem wall | 2/25/2016 | 2/26/2016 | 2/27/2016 | P | PART |
Dave Hannah
|
|
|
MJ ###-#### - 30min call ahead requested - Rebar Insp.elev pit ftg ok
|