Information based on query as of Thursday, June 20, 2024.
Permit Information
Permit NumberGCB15-00145
StatusFinaled
Name Cole Architects
Site Address 2900 W CHINDEN BLVD
Project NameBLD2015-00145
Customer Number 
ePlanReviewNo
Description
(RIVERSIDE HOTEL) """ PLAN MODIFICATION 2 TO REMOVE ELEVATOR#1 FROM THE SCOPE OF WORK TO BE DONE AT A LATER DATE AND SEPARATE PERMIT""" ""PLAN MODIFICATION TO ADDRESS A LACK OF CONTINUITY OF A FIRE BARRIER TO CONTINUE UP TO THE UNDERSIDE IF THE ROOF SHEETING. Permit for the construction new stairways and the installation of two new elevators. The new building enclosures for the elevators and stairways will be added on to the exterior of the existing building, new mini-split HVAC units will be installed to condition the new spaces. All work per the approved plans and the attached engineering. This building is fully fire sprinklered for the R occupancy. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 and 72 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final8/22/20168/22/20168/22/2016PPASS
DetailsDave Hannah
MJ ###-#### - requested call ahead-as per Dave Hannah when he did the building final there was no elevator # 1 (only elevator #2)-see plan mod
GCB-Final8/2/20168/3/20168/3/2016PFAIL
DetailsMike Jordan
MJ ###-#### - requested call ahead. Provide engineering for cable guards. Install cane guard as shown on approved plans. handrail extensions on interior stairs do not meet the minimum 12 inches. Provide hanrails/edge protection on ramp at accessible route.
FIRE-Final Inspection8/1/20168/1/20168/1/2016PPASS
DetailsKatie Marron
Fire life safety complete on ONE stairway and elevator at the far west end.
FIRE-Conference7/20/20167/20/20167/20/2016ADONE
DetailsKatie Marron
Phone discussion with MJ to discuss if notification devices will need to be tested. Told him yes and he is going to coordinate with hotel for a good time.
When performing this final try to final
GCB12-00032 and NAF16-00044
GCB-Ceiling Grid7/11/20167/12/20167/12/2016APASS
DetailsDave Hannah
MJ ###-####
GCB-Courtesy6/3/20166/3/20166/3/2016PDONE
DetailsDave Hannah
Mark ###-#### - need to look at slope of ramp
GCB-Framing5/26/20165/26/20165/27/2016PPASS
DetailsDave Hannah
Mark ###-#### ok to cover 1 hr fire wall second floor top of wall in attic space
GCB-Framing5/18/20165/19/20165/19/2016AFAIL
DetailsJim Storey
Mark ###-#### need detail for new 1 hr walls thur roof on top of detail a202/b2//ok to cover east and south walls
GCB-Framing5/2/20165/2/20165/2/2016PPASS
DetailsDave Hannah
Mark ###-####
GCB-Framing4/28/20164/29/20164/29/2016APART
DetailsJim Sly
Mark ###-#### - Roof framing & steel insp for wire mesh - pouring at 10a.m.
MTI looking at Concrete. Roof framing not ready.
GCB-Stem wall3/3/20163/4/20163/4/2016AFAIL
DetailsPhil Shearer
MJ ###-#### Provide aproved changes to colunms
GCB-Stem wall2/29/20163/1/20163/1/2016PPASS
DetailsDave Hannah
Mark ###-#### - Rebar Insp. - requested 2p.m. insp. ftgs
GCB-Stem wall2/25/20162/26/20162/27/2016PPART
DetailsDave Hannah
MJ ###-#### - 30min call ahead requested - Rebar Insp.elev pit ftg ok