DOC - Permit Finaled | | | 1/18/2019 | | DONE |
|
|
|
Per passing final inspection 5/31/18 by Jim Sly
|
GRD-Conference | 5/30/2018 | 5/31/2018 | 5/31/2018 | A | CANC |
Jim Sly
|
|
|
Nick Phone #: ###-####
|
GRD-Final | 5/31/2018 | 5/31/2018 | 5/31/2018 | A | DONE |
Tiffany Lowery
|
|
|
|
GRD-Final | 3/29/2018 | 3/29/2018 | 3/30/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. The fire dept is going to address the bollards at the fire hydrants and the gate width/access issues per Assistant Chief Ron.
Phone #: ###-#### Inspection requested via web by Chris Palmer
|
FIRE-Final Inspection | 3/29/2018 | 3/29/2018 | 3/30/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. The fire dept is going to address the bollards at the fire hydrants and the gate width/access issues per Assistant Chief Ron.
Phone #: ###-#### Inspection requested via web by Chris Palmer
|
FIRE-Final Inspection | 3/28/2018 | 3/29/2018 | 3/29/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 3/27/2018 | 3/28/2018 | 3/28/2018 | A | FAIL |
Troy Cobbley
|
|
|
No city approved plans or small documents on site. No inspection performed.
Phone #: ###-#### Inspection requested via web by Chris Palmer
|