Final | 6/21/2004 | 6/21/2004 | 6/21/2004 | | DONE |
|
|
|
Final approved per Dixie
|
DOC - Permit Finaled | | | 6/21/2004 | | DONE |
|
|
|
|
Final | 5/19/2004 | 5/19/2004 | 5/19/2004 | P | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson gave advanced temp final...waiting on plumbers and gas w/h's 5/19/2004 1:54:57 PM
|
Final | 5/14/2004 | 5/17/2004 | 5/17/2004 | A | FAIL |
Dixie Fellows
|
|
|
###-#### called jeff and left message to meet me at job...no return call 5/17/2004 3:50:53 PM
|
Final | 5/13/2004 | 5/14/2004 | 5/14/2004 | P | CANC |
Dixie Fellows
|
|
|
Please note that this is a final on the entire project.; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson rescheduled for monday...called gary 5/14/2004 5:26:50 PM
|
Final | 5/3/2004 | 5/4/2004 | 5/4/2004 | A | FAIL |
Troy James
|
|
|
This is a final on the first floor corridor only. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
Need to install access cover to smoke damper closer to damper in order to reach damper inside. North mechanical room. Ok to drop tiles in corridor 1 st floor. 5/4/2004 10:19:36 AM 5/4/2004 10:20:00 AM
|
Rough-in | 4/12/2004 | 4/12/2004 | 4/12/2004 | P | PASS |
Dixie Fellows
|
|
|
This is for the 2nd floor only. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson 2nd floor diffusers and 3rd floor s/f dampers ok 4/12/2004 2:52:34 PM
|
Rough-in | 3/31/2004 | 4/1/2004 | 4/1/2004 | P | FAIL |
Troy James
|
|
|
This is a partial RI on the 2nd & 3rd floor corridors only. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
Incorrect 1 hour assembly at corridor north wing and furnace room. Also need additional fire/smoke damper where duct penetrates 1 hour assembly. 4/1/2004 3:03:23 PM
|
Conference | 2/16/2004 | 2/17/2004 | 2/17/2004 | A | PART |
Jim Sly
|
|
|
Please contact Jeff Stone Project Manager to coordinate the time for this conference. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson Dixie, me and HVAC contr talked about install of fire dampers @ 3rd floor ceiling. 2/17/2004 11:19:14 AM
|
Rough-in | 2/10/2004 | 2/11/2004 | 2/11/2004 | A | PASS |
Dixie Fellows
|
|
|
Please note this is for the 2nd floor only.; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson 2nd floor ok 2/11/2004 12:20:52 PM
|
Conference | 2/4/2004 | 2/5/2004 | 2/5/2004 | A | PASS |
Dixie Fellows
|
|
|
###-#### chuck s/f dampers in hallway feuip rooms 2/5/2004 10:23:26 AM
|
Rough-in | 1/15/2004 | 1/16/2004 | 1/16/2004 | A | PART |
Dixie Fellows
|
|
|
Please note that this is for a partial rough-in for the third floor only.; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
|
Conference | 1/7/2004 | 1/8/2004 | 1/8/2004 | A | PART |
Jim Sly
|
|
|
Please call Jennifer with the exact time of this conference inspection. Thanks.; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson Talked about fire dampers at third floor ceiling. 1/8/2004 12:05:52 PM
|
Conference | 12/16/2003 | 12/17/2003 | 12/17/2003 | A | PASS |
Jim Sly
|
|
|
Chuck ###-#### Met with super, HVAC contr and Dixie....... 12/17/2003 9:53:41 AM
|
Conference | 12/16/2003 | 12/17/2003 | 12/17/2003 | A | PASS |
Dixie Fellows
|
|
|
Sarah; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
Conference | 12/15/2003 | 12/16/2003 | 12/16/2003 | A | FAIL |
Dixie Fellows
|
|
|
If this could take mid morning that would be great. If you have questions please contact Jennifer.; Phone #: ###-#### Internet Inspection Request from: Debbie Rapp not able to connect today...will meet billy wed am at 8:30 12/16/2003 10:44:58 AM
|