Conference | 3/27/2006 | 3/28/2006 | 3/28/2006 | A | PASS |
Troy James
|
|
|
met with Dixie to show her the job, she will take over TI's
|
Conference | 3/28/2006 | 3/28/2006 | 3/28/2006 | P | PASS |
Dixie Fellows
|
|
|
meet troy at 1:30...met with troy to look over job, as i will be taking over the inspections for the ti"s
|
Final | 3/28/2006 | 3/28/2006 | 3/28/2006 | P | PASS |
Troy James
|
|
|
|
Final | 3/28/2006 | 3/28/2006 | 3/28/2006 | A | PEND |
Dixie Fellows
|
|
|
See Stan Lillquist with TML; Phone #: ###-#### Internet Inspection Request from: Dan Flaherty..this was troys final
|
Conference | 3/27/2006 | 3/27/2006 | 3/28/2006 | A | DEFR |
Dixie Fellows
|
|
|
scheduled for tues am
|
Conference | 3/21/2006 | 3/22/2006 | 3/22/2006 | A | PASS |
Troy James
|
|
|
meeting at 9:00 am, 225 9th st suite 610
|
Rough-in | 3/20/2006 | 3/20/2006 | 3/20/2006 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/20/2006 at 9:59:05 AM. Contact: ###-####. core and shell ok for temp
|
Rough-in | 3/13/2006 | 3/14/2006 | 3/14/2006 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/13/2006 at 3:20:31 PM. Contact: ###-####. need to verify fire damper required at intermediate floor transfer air and combustion air at penthouse and fire dampers at floor penetrations in some instances need to be verified. ok fire dampers at floors 6 and 7 at shaft and all air handler units ok
|
Rough-in | 2/28/2006 | 2/28/2006 | 2/28/2006 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/28/2006 at 8:17:18 AM. Contact: ###-####. f/d and rough ok at restrooms to floors 2 through 5
|
Rough-in | 2/22/2006 | 2/23/2006 | 2/23/2006 | A | FAIL |
Troy James
|
|
|
dan ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie fsd still installed incorrectly at shaft wall
|
Rough-in | 2/6/2006 | 2/7/2006 | 2/10/2006 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/6/2006 at 2:30:59 PM. Contact: ###-####. need angles on all four sides of f/d at shaft with screws every 8" screwed into shaft
|
Rough-in | 1/10/2006 | 1/11/2006 | 1/11/2006 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/10/2006 at 2:47:34 PM. Contact: ###-####....1st floor bathrooms ok
|
Rough-in | 12/29/2005 | 12/30/2005 | 12/30/2005 | A | PART |
Dixie Fellows
|
|
|
stan ###-####...shaft on 7-9th floors ok
|
Rough-in | 12/29/2005 | 12/29/2005 | 12/29/2005 | P | PEND |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/29/2005 at 10:23:26 AM. Contact: ###-####....i rescheduled this for fri am..i will meet stan at 8:30
|
Rough-in | 12/8/2005 | 12/9/2005 | 12/9/2005 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/8/2005 at 2:11:58 PM. Contact: ###-####...looked at s/f dampers at shaft
|
Rough-in | 11/16/2005 | 11/17/2005 | 11/17/2005 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/16/2005 at 3:56:11 PM. Contact: ###-####...ok to cover exhaust shafts
|