Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberMEC05-04183
StatusFinaled
Name RM MECHANICAL
Site Address 1055 N CURTIS RD
Project Name 
Customer Number05-103
ePlanReview 
Description
Mechanical Permit - New: NATURAL GAS, TEMP. HEAT, HOT WATER SUPPLY & RETURN, CHILLED WATER SUPPLY & RETURN, LOW PRESSURE STEAM, MED. PRESSURE STEAM, HIGH PRESSURE STEAM, STEAM COND. RETURN, HVAC COND. DRAIN, HVAC DEMO, HVAC EQUIPMENT, CORE DRILLED/LINK SEAL HOLES, GENERATOR GLYCO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final10/23/200710/24/200710/24/2007APASS
DetailsAlan Hauser
Final7/18/20077/18/20077/19/2007PPASS
DetailsAlan Hauser
Rough-in7/17/20077/17/20077/17/2007PPASS
DetailsAlan Hauser
last inspection, all piping inspected
MEC-Aging Inspection6/18/20076/18/20076/18/2007 CANC
DetailsAlan Hauser
Pressure Test4/18/20074/18/20074/18/2007PPART
DetailsAlan Hauser
2nd floor entire loop ok
Rough-in3/30/20073/30/20073/30/2007PPART
DetailsAlan Hauser
cws, cwr, and hws, hwr ok for penthouse and shaft
Rough-in3/8/20073/8/20073/8/2007APART
DetailsAlan Hauser
forgot to add time to other inspections
Rough-in3/7/20073/8/20073/8/2007APART
DetailsAlan Hauser
8th floor tests ok for loops
Rough-in3/7/20073/7/20073/8/2007PPART
DetailsAlan Hauser
8th floor test ok for loops
MEC-Aging Inspection2/21/20072/21/20072/21/2007 CANC
DetailsAlan Hauser
Rough-in12/4/200612/5/200612/5/2006APART
DetailsAlan Hauser
5th floor heating loop ok
Final11/14/200611/16/200611/16/2006APART
DetailsAlan Hauser
final for pharmacy and looked at piping on 6th floor, two uh and cwr and cws
Rough-in10/30/200610/31/200610/31/2006APART
DetailsAlan Hauser
hydronics all 4th floor
Rough-in10/5/200610/6/200610/6/2006PPART
DetailsAlan Hauser
heating supply and return loop from basement to 10th floor
Pressure Test9/28/20069/29/20069/29/2006APART
DetailsJim Johnson
david; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley 60 # gas test for third floor fire place test ok
Pressure Test9/26/20069/27/20069/27/2006PPEND
DetailsDixie Fellows
david; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles..i spoke wiith dave and ask him to reschedule this for thurs am, as alan is not in today. i also told him if this became a big problem to call me and i would come out and do it..thanks alot dixie
Rough-in9/15/20069/18/20069/18/2006APART
DetailsAlan Hauser
walked 2nd floor with david, piping ok
Rough-in9/12/20069/13/20069/13/2006APART
DetailsAlan Hauser
david Note: heating supply & return; piping ok for rest of 1st floor, and all of 3rd floor except little in old building
MEC-Aging Inspection7/18/20067/18/20067/18/2006 CANC
DetailsAlan Hauser
Rough-in5/17/20065/18/20065/18/2006APART
DetailsAlan Hauser
low and med. steam to 2nd floor surgery






















Rough-in5/16/20065/16/20065/16/2006PPART
DetailsAlan Hauser
hps piping in basement
Rough-in5/10/20065/11/20065/11/2006PPART
DetailsLee Rice
gary Note: consedate ceiling; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles pumped condensate in basement and surgery basement 1st and snd floor low pressure steam cond returns. tests ok.
Conference5/2/20065/3/20065/3/2006APART
DetailsAlan Hauser
Rough-in5/2/20065/2/20065/3/2006PPART
DetailsAlan Hauser
Gary; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
Rough-in4/13/20064/13/20064/13/2006PPART
DetailsAlan Hauser
hot water heating side basement ok
Rough-in4/6/20064/6/20064/6/2006PPART
DetailsAlan Hauser
Jerry -- cooling water cover; ok, for basement area 100
MEC-Aging Inspection3/13/20063/13/20063/13/2006 CANC
DetailsTroy James
wip
Rough-in1/10/20061/11/20061/11/2006APART
DetailsTroy James
jerry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
looked at mpc line at first level
Rough-in12/21/200512/21/200512/21/2005PPART
DetailsTroy James
Scheduled by a contractor via Hello! on 12/21/2005 at 9:56:46 AM. Contact: ###-####. inspected hydronics first level