Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberMEC05-04294
StatusFinaled
Name YMC INC
Site Address 495 S CAPITOL BLVD
Project NameBODO BLDG #8
Customer Number21330
ePlanReview 
Description
12/29/2005 - (Hampton Inn) install new HVAC equipment & ally's for 6th thru 11th floor tenent improvements areas per mech drawing - $830,000 per initial cert of value - cmc ///Final value is $1,288,556//4/5/07 LEG
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final1/22/20071/29/20071/29/2007APASS
DetailsTroy James
MEC-Aging Inspection1/16/20071/16/20071/17/2007 PASS
DetailsDixie Fellows
wip
MEC-Aging Inspection11/13/200611/13/200611/13/2006 PASS
DetailsDixie Fellows
HOTEL JOB...WORK IN PROGRESS
MEC-Aging Inspection9/11/20069/11/20069/11/2006 PASS
DetailsDixie Fellows
HOTEL...WIP
Rough-in7/12/20067/12/20067/12/2006PPASS
DetailsTroy James
fsd at 5th floor and shaft at vending from sixth to 11the floor, still need shaft built around duct that terminates exterior
Rough-in7/11/20067/11/20067/11/2006PPASS
DetailsTroy James
did walk through to verify progress in building for lee rice
Rough-in6/21/20066/21/20066/21/2006APART
DetailsTroy James
ok fsd at 5th floor and 10th floor vending, duct exiting shaft at vending south end required to have fsd
Rough-in6/15/20066/15/20066/15/2006APASS
DetailsTroy James
ok to cover ceilings at bathrooms on 10th floor
Rough-in5/17/20065/17/20065/17/2006PPASS
DetailsTroy James
ok fsd at shafts up to 10th floor except at vending areas not completed
Final4/12/20064/17/20064/17/2006ACANC
DetailsTroy James
meet mike wisdom at 10:30
met last friday
Conference4/13/20064/14/20064/14/2006PPASS
DetailsTroy James
meet mike wiscom at 1:30
met to discuss where fsd and fd are required at floors 5 through 11 floors
Rough-in4/13/20064/13/20064/13/2006PPASS
DetailsTroy James
ok to cover ceilings at guest bathrooms
Rough-in3/31/20064/3/20064/3/2006APASS
DetailsTroy James
checked fsd at shafts to floors 9 and 10
Rough-in3/31/20063/31/20064/3/2006PCANC
DetailsTroy James
Rough-in3/27/20063/27/20063/27/2006PFAIL
DetailsTroy James
fsd at shafts to floors 7,8 ok fsd are required where exhaust fan and supply duct have opening into corridor at linen/storage room
Rough-in3/20/20063/20/20063/20/2006PFAIL
DetailsTroy James
ok shafts at floor 5 and 6 see job plans for highlighted shafts, need to verify if corridor penetrations need fsd at 6th floor exhaust to vending area, and supply duct at same location