Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberMEC07-03059
StatusFinaled
Name TOTAL COMFORT HVAC LLP
Site Address 406 S 13TH ST
Project Name 
Customer Number 
ePlanReview 
Description
Mechanical Permit - New: Install new HVAC system for 35 apartments.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final4/15/20084/15/20084/15/2008PPASS
DetailsDixie Fellows
###-#### Ivan
Final3/20/20083/21/20083/21/2008APART
DetailsDixie Fellows
Dixie this is a request from PETRA for an inspection on cabinets and cook tops. They have requested that I be onsite to met with you. Phone #: ###-#### Internet Inspection Request from: Thomas Harrison...temp occ on units 103,104,105,205,403,404,405 only at this time..dixie
Conference3/4/20083/5/20083/7/2008APASS
DetailsDixie Fellows
jack ###-####...met with jack to discuss overhead combustible cabinets at cook-tops..i then called him thurs pm and told him to contact the engineer on the job.
Conference3/3/20083/4/20083/4/2008APEND
DetailsDixie Fellows
Scheduled by a contractor via Hello! on 3/3/2008 at 3:49:23 PM. Contact: ###-####....called manuf...waiting for return call
Final3/3/20083/4/20083/4/2008ANR
DetailsDixie Fellows
Alternate phone ###-####
Final inspection, first floor, re-inspection on roof and all items relevant to Total Comfort Hvac. Phone #: ###-#### Internet ..Inspection Request from: Thomas Harrison....waiting for cabinet clearance to gas cook-tops to be resolved
Conference2/21/20082/22/20082/22/2008APASS
DetailsDixie Fellows
Scheduled by a contractor via Hello! on 2/21/2008 at 3:20:49 PM. Contact: ###-####....met with jack to discuss clearances above counter to overhead cabinets
Final2/19/20082/20/20082/21/2008AFAIL
DetailsDixie Fellows
Final inspection for floors 2,3,4,5 all units and Roof. Phone #: ###-#### Internet Inspection Request from: Thomas Harrison...posted corrections for floors 2-5 and the roof with jack and contractor
Rough-in10/31/200711/1/200711/1/2007APASS
DetailsBill VanDegrift
Rough in inspection 5th floor.
Phone #: ###-#### Internet Inspection Request from: Thomas Harrison 5th floor ri ok
Rough-in10/19/200710/22/200710/22/2007APART
DetailsDixie Fellows
Ivan, will be on site please call ###-####.
Re-inspection for units 105,205,305 added dryer booster fan. Also rough in inspection for all units fourth floor. Phone #: ###-#### Internet Inspection Request from: Thomas Harrison...ok for for cover in all areas listed in request
Rough-in10/8/200710/9/200710/9/2007AFAIL
DetailsDixie Fellows
Reinspect dryer vent rooms 105,205,305

Lee ###-####
Ivan ###-####
Tom ###-#### Phone #: ###-#### Internet Inspection Request from: Thomas Harrison...will need booster fans in above units
Rough-in10/1/200710/2/200710/2/2007APART
DetailsDixie Fellows
call Tom at ###-#### or Ivan at ###-#### when headed to project so we can meet the inspector at the site. Inspection is for 1,2, and 3 floor unit cover inspection. Phone #: ###-#### Internet Inspection Request from: Thomas Harrison....partial cover except in rooms 105-205-207 dryer vents exceed allowable length
Rough-in9/28/200710/1/200710/1/2007AFAIL
DetailsDixie Fellows
cover inspection for first, second and third floor, all units. Phone #: ###-#### Internet Inspection Request from: Thomas Harrison..called tom-no return call...went to job site called (jack)...he called the journeyman on site to meet me..i waited 10 minutes and nobody showed up
Rough-in9/27/20079/28/20079/28/2007APART
DetailsDixie Fellows
1/2/3 cover mechanical rooms. Phone #: ###-#### Internet Inspection Request from: Thomas Harrison...ok to cover lids in mechanical rooms 1-2-3 floors
Rough-in9/26/20079/26/20079/26/2007PPART
DetailsDixie Fellows
General contractor is requesting cover inspections for mechanical rooms that are completed on first, second and third floors, one unit on each floor is not ready, waiting on engineering. Phone #: ###-#### Internet Inspection Request from: Thomas Harrison...ok to cover closet lids on units signed off on plans
Conference9/5/20079/6/20079/6/2007APASS
DetailsDixie Fellows
meet with tom and dave at 9:00....reviewed plans and discussed fire penetrations, dampers, dryer vents, bath exhaust, etc....need stamped signed document from engineer on all changes
Conference9/4/20079/5/20079/5/2007APEND
DetailsDixie Fellows
We would like to review this project with the mechanical and structural inspectors. Phone #: ###-#### Internet Inspection Request from: Thomas Harrison....rescheduled so we could meet with dave hanah