Final | 8/12/2010 | 8/12/2010 | 8/12/2010 | P | PASS |
Dixie Fellows
|
|
|
ok per Dixie ///dld....job finaled...decorative f/p will be pulled under another permit
|
Final | 8/6/2010 | 8/9/2010 | 8/9/2010 | A | NR |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Karl Hestekin
|
Final | 8/3/2010 | 8/4/2010 | 8/4/2010 | A | FAIL |
Dixie Fellows
|
|
|
rescheduled for wed am..gas line undersized...f/p and hood not installed yet...all ductwork above hood to be noncombustible...air balance not done..need to check roof when equipment ready
|
Final | 8/2/2010 | 8/3/2010 | 8/3/2010 | A | PEND |
Dixie Fellows
|
|
|
Karl Hestekin Phone #: ###-#### >> Inspection requested via web by Karl Hestekin...rescheduled for wed am
|
Rough-in | 7/12/2010 | 7/12/2010 | 7/12/2010 | P | PASS |
Dixie Fellows
|
|
|
Karl Hestekin Phone #: ###-#### >> Inspection requested via web by Karl Hestekin...2nd wrap ok
|
Rough-in | 7/9/2010 | 7/9/2010 | 7/9/2010 | A | PASS |
Troy James
|
|
|
ok first layer of grease duct wrap in kitchen area
|
Rough-in | 7/7/2010 | 7/8/2010 | 7/8/2010 | A | PART |
Dixie Fellows
|
|
|
Grease Duct Welds Inspection requested from web by: Karl Hestekin Phone #: ###-####..pinholes all repaired..ok to cover with insulation
|
Rough-in | 7/6/2010 | 7/7/2010 | 7/7/2010 | A | FAIL |
Dixie Fellows
|
|
|
grease duct weld inspection//Karl ###-####..fix holes in grease duct..sand down rough edges at top of hood..pan out all metal in r/a drops
|
Rough-in | 6/16/2010 | 6/17/2010 | 6/17/2010 | P | PART |
Dixie Fellows
|
|
|
roy - around 1:00 if possible please Phone #: ###-####...section of grease duct from curb down good for light test
|