Final | 9/7/2012 | 9/7/2012 | 9/7/2012 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Shaun Vogler
|
Rough-in | 5/10/2012 | 5/10/2012 | 5/10/2012 | A | PASS |
Dixie Fellows
|
|
|
duct blaster ok
|
Conference | 5/9/2012 | 5/9/2012 | 5/9/2012 | P | FAIL |
Dixie Fellows
|
|
|
Duct blast scheduled for 1:30 pm with Matt from Momentum. Phone #: ###-#### >> Inspection requested via web by Shaun Vogler...this should have been a r/i
|
Rough-in | 5/9/2012 | 5/9/2012 | 5/9/2012 | P | FAIL |
Dixie Fellows
|
|
|
air source...no manual J on site...no plans on site...no furnace set....i didn't accept the duct blaster test due to these corrections...re-call all when the job is READY
|
Pressure Test | 4/30/2012 | 4/30/2012 | 4/30/2012 | P | PASS |
Troy James
|
|
|
25# test
|
Rough-in | 4/30/2012 | 4/30/2012 | 4/30/2012 | P | PASS |
Troy James
|
|
|
Rough and pressure test. Phone #: ###-#### >> Inspection requested via web by Shaun Vogler no duct blast test
|