Final | 11/1/2012 | 11/1/2012 | 11/1/2012 | P | PASS |
Dixie Fellows
|
|
|
contact griff with any questions...signed the card
|
Pressure Test | 10/18/2012 | 10/19/2012 | 10/19/2012 | A | PASS |
Dixie Fellows
|
|
|
Pressure test B rack refrigertion. Site contact Griff Stallings 208 ###-#### Phone #: ###-#### >> Inspection requested via web by Preston Schulthies...loop B and C OK AT 100LBS
|
Pressure Test | 10/11/2012 | 10/12/2012 | 10/12/2012 | A | PART |
Dixie Fellows
|
|
|
Griff Stalling will be the onsite contact. This will system A refrigeration. Phone #: ###-#### >> Inspection requested via web by Preston Schulthies...test on A LOOP REFRIG. LINES OK
|
Rough-in | 7/30/2012 | 7/31/2012 | 7/31/2012 | A | PASS |
Troy James
|
|
|
grif Phone #: ###-#### ok all underground refrigeration incased in pvc piping
|
Conference | 7/30/2012 | 7/30/2012 | 7/30/2012 | P | CANC |
Dixie Fellows
|
|
|
###-####....grift has called about an inspection they thought was scheduled last friday..i told him it was never scheduled, so he will reschedule and attach this permit to the building permit
|