Final | 10/19/2015 | 10/20/2015 | 10/20/2015 | P | PASS |
Dixie Fellows
|
|
|
please do a final inspection. call eric to meet onsite ###-#### Phone #: ###-#### >> Inspection requested via web by Alana Lane..ductwork on 2nd floor ok..job finaled
|
Final | 10/12/2015 | 10/15/2015 | 10/15/2015 | P | PASS |
Dixie Fellows
|
|
|
John Phone #: ###-####
|
Pressure Test | 4/15/2015 | 4/16/2015 | 4/16/2015 | P | PASS |
Dixie Fellows
|
|
|
Someone will be on-site or there is a lock box code for entry = 3993 Phone #: ###-#### >> Inspection requested via web by Angie Maguire
|
Rough-in | 4/15/2015 | 4/16/2015 | 4/16/2015 | P | PASS |
Dixie Fellows
|
|
|
Someone will be on-site or there is a lock box code for entry = 3993 Phone #: ###-#### >> Inspection requested via web by Angie Maguire
|