Final | 6/22/2015 | 6/23/2015 | 6/23/2015 | A | PASS |
Troy James
|
|
|
Please call Dave for access if needed. Phone #: ###-#### >> Inspection requested via web by David Cole
|
Final | 6/17/2015 | 6/22/2015 | 6/22/2015 | P | FAIL |
Troy James
|
|
|
Please call Dave for access 30 minutes ahead of arrival if needed. Phone #: ###-#### >> Inspection requested via web by David Cole Need exterior vent cap for gas regulator at make up air unit. Sediment trap after valve and before regulator and test port downstream of regulator
|
Final | 6/13/2015 | 6/18/2015 | 6/17/2015 | A | CANC |
Chad Schwendiman
|
|
|
Call Dave for access. ###-#### Phone #: ###-#### >> Inspection requested via web by David Cole Inspection cancelled from web by: David Cole
|
Final | 6/9/2015 | 6/10/2015 | 6/10/2015 | A | NR |
Chad Schwendiman
|
|
|
Call Dave for access. ###-#### Phone #: ###-#### Inspection requested via web by David Cole - not ready for a final. I entered a rough in for this.
|
Pressure Test | 6/10/2015 | 6/10/2015 | 6/10/2015 | A | PASS |
Chad Schwendiman
|
|
|
Call Dave for access. ###-#### Phone #: ###-#### Inspection requested via web by David Cole - 60lb gas pass
|
Rough-in | 6/10/2015 | 6/10/2015 | 6/10/2015 | A | PASS |
Chad Schwendiman
|
|
|
Call Dave for access. ###-#### Phone #: ###-#### Inspection requested via web by David Cole
|