Final | 2/8/2017 | 2/9/2017 | 2/9/2017 | A | PASS |
Chad Schwendiman
|
|
|
Request for final inspection. Please contact Larry ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery
|
Final | 2/7/2017 | 2/8/2017 | 2/8/2017 | P | FAIL |
Chad Schwendiman
|
|
|
Request for final inspection. Please contact Larry ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - need to complete uv protection on linesets, need to finish missing fire damper access labels
|
Final | 2/2/2017 | 2/3/2017 | 2/3/2017 | P | PART |
Ben Livingston
|
|
|
Request for Final inspection. Please contact Larry ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery finish firedamper access labels, finish fireplace trim, linesets on roof need uv protection, pandeck needs to be cut for roof access
|
Final | 1/13/2017 | 1/13/2017 | 1/13/2017 | P | PART |
Chad Schwendiman
|
|
|
Temporary occupancy okay for 1st through 4th floors
|
Final | 1/11/2017 | 1/12/2017 | 1/12/2017 | P | FAIL |
Chad Schwendiman
|
|
|
Request for Final inspection floors 1-4. Please contact Larry ###-#### or Jerry ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - need air balance report for 1st through 4th floors
|
Rough-in | 1/10/2017 | 1/11/2017 | 1/11/2017 | A | PART |
Chad Schwendiman
|
|
|
Request for cover inspection for 2 penthouse suites 6th floor. Please contact Larry ###-#### or Jerry ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - okay to cover penthouse ceilings
|
Rough-in | 1/4/2017 | 1/6/2017 | 1/6/2017 | A | CANC |
Chad Schwendiman
|
|
|
Request for cover inspection Capital side of the building corridor on 6th Floor. Please contact Jerry ###-#### or Larry ###-#### with any questions or concerns. Phone #: ###-#### >> Inspection requested via web by Heather Gransbery
|
Rough-in | 1/5/2017 | 1/5/2017 | 1/5/2017 | P | PART |
Chad Schwendiman
|
|
|
Jerry Phone #: ###-#### - okay to cover 6th floor corridoor
|
Rough-in | 1/4/2017 | 1/4/2017 | 1/4/2017 | P | FAIL |
Chad Schwendiman
|
|
|
Request for cover inspection Capital side of building corridor on 6th Floor. Please contact job lead Larry ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - Need to install duct mounted access doors for fire/smoke dampers, need to install retaining angles on fire damper at elevator lobby wall
|
Rough-in | 12/29/2016 | 12/30/2016 | 12/30/2016 | P | PART |
Chad Schwendiman
|
|
|
Request for 6th Floor R/I inspection Capital side of the building. All except 2 penthouses. Please contact lead, Larry, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - okay to cover guest rooms on the 6th floor capitol side of the building except for penthouse rooms
|
Conference | 12/22/2016 | 12/22/2016 | 12/22/2016 | P | DONE |
Chad Schwendiman
|
|
|
Limited use temporary occupancy okay for 1st floor lobby, second floor okay for guided tours only.
|
Rough-in | 12/21/2016 | 12/22/2016 | 12/22/2016 | A | PART |
Chad Schwendiman
|
|
|
Request for inspection 6th Floor Myrtle Corridor, 6th Flo elevator lobby, and rooms on Capital Side of 6th Fl. Please contact lead, Jerry, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - 6th floor elevator lobby okay to cover. the other areas aren't ready yet
|
Rough-in | 12/19/2016 | 12/19/2016 | 12/19/2016 | A | PART |
Chad Schwendiman
|
|
|
Temp occupancy inspection request for 1, 2, 3rd floors. Please contact Jerry ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - Okay for 10 hotel staff to occupy the 1st and second floors.
|
Rough-in | 12/16/2016 | 12/16/2016 | 12/16/2016 | A | FAIL |
Chad Schwendiman
|
|
|
Temp occupancy inspection request for 1st, 2nd and 3rd fl. Request for inspection 6th floor myrtle North side of the building. please contact Jerry ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - need to label fire damper access panels, need to correct improperly installed fire/smoke damper on 6th floor, need to complete condensate on unit in 2nd floor data room. Okay to cover guest rooms on 6th floor north side of myrtle
|
Rough-in | 12/15/2016 | 12/15/2016 | 12/15/2016 | P | FAIL |
Chad Schwendiman
|
|
|
Temporary occupancy inspection request for 1st and 2nd floor. request for R/I inspection 6th Floor Myrtle North side of the building. Please contact Jerry ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - missing duct detector, condensates not complete, ducting needs to be completed
|
Rough-in | 12/15/2016 | 12/15/2016 | 12/15/2016 | P | CANC |
Chad Schwendiman
|
|
|
Request for R/I inspection 6th floor Myrtle North side of the building. Please contact Larry ###-#### or Jerry ###-#### with any questions or concerns. Phone #: ###-#### >> Inspection requested via web by Heather Gransbery Inspection cancelled from web by: Heather Gransbery
|
Rough-in | 12/14/2016 | 12/15/2016 | 12/15/2016 | A | CANC |
Chad Schwendiman
|
|
|
Request for R/I inspection 6th Floor Myrtle North side of the building. Please contact Larry ###-#### or Jerry ###-#### with any questions or concerns. Phone #: ###-#### >> Inspection requested via web by Heather Gransbery Inspection cancelled from web by: Heather Gransbery
|
Rough-in | 12/12/2016 | 12/13/2016 | 12/13/2016 | A | PART |
Chad Schwendiman
|
|
|
Request for inspection 6th Floor Myrtle side of building. Please contact job lead, Larry, ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - okay to cover guest rooms on the south side of myrtle on the 6th floor
|
Rough-in | 12/2/2016 | 12/5/2016 | 12/5/2016 | P | PART |
Chad Schwendiman
|
|
|
Request for shaft inspection, 6th floor. Please contact job lead, Larry, with any questions or concerns ###-####. Phone #: ###-#### Inspection requested via web by Heather Gransbery - okay to cover grid ceilings in 1st floor lobby/office area, okay to cover grid ceilings on 2nd foor, okay to cover mechanical shafts on 6th floor
|
Rough-in | 12/1/2016 | 12/2/2016 | 12/2/2016 | A | FAIL |
Chad Schwendiman
|
|
|
Inspection request for 1st and 2nd FL cover for grid, Capital side of building. Please contact job lead, Larry, ###-####, with any questions or concerns. Inspection requested via web by Heather Gransbery - need 1/4" per foot of rise on b-vent, need 1" clearance on b-vent, need to complete condensate connections and fresh air to ceiling cassettes, need to verify if fire dmper is needed on fresh air duct into laundry room
|
Rough-in | 11/30/2016 | 12/1/2016 | 12/1/2016 | P | CANC |
Chad Schwendiman
|
|
|
Inspection request for 1st and 2nd FL cover for grid, Capital side of building. Please contact job lead, Larry, ###-####, with any questions. Phone #: ###-#### >> Inspection requested via web by Heather Gransbery Phone #: ###-#### >> Inspection requested via web by Heather Gransbery Inspection cancelled from web by: Heather Gransbery Inspection cancelled from web by: Heather Gransbery
|
Rough-in | 11/28/2016 | 11/30/2016 | 11/30/2016 | P | CANC |
Chad Schwendiman
|
|
|
Inspection request for 1st and 2nd FL cover for grid, Capital side of building. Please contact job lead, Larry, ###-####, with any questions. Phone #: ###-#### >> Inspection requested via web by Heather Gransbery Inspection cancelled from web by: Heather Gransbery
|
Rough-in | 11/17/2016 | 11/18/2016 | 11/18/2016 | P | PART |
Ben Livingston
|
|
|
Request for cover inspection for Capital side of the building 5th Fl corridor and rooms. Please contact Larry, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery 5th floor capital side rooms, coridor, 3 chases, ok for cover
|
Rough-in | 11/15/2016 | 11/15/2016 | 11/15/2016 | P | PART |
Chad Schwendiman
|
|
|
Request for cover inspection 5th Fl. Corridor on Myrtle and Capital sides of the building. Please contact job lead, Larry, ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - okay to cover cooridoor ceiling on myrtle side of building
|
Rough-in | 11/14/2016 | 11/15/2016 | 11/15/2016 | P | CANC |
Chad Schwendiman
|
|
|
Request for cover inspection 5th Fl corridor on Myrtle and Capital sides of building. Cover inspection for rooms on Myrtle side of the building. Please contact job lead, Larry, ###-####, with any questions or concerns. Phone #: ###-#### >> Inspection requested via web by Heather Gransbery Inspection cancelled from web by: Heather Gransbery
|
Rough-in | 11/9/2016 | 11/9/2016 | 11/9/2016 | P | PART |
Chad Schwendiman
|
|
|
Inspection request for cover. Rooms on 5th Floor Myrtle side of the building. Please contact lead, Larry ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - okay to cover guest rooms on 5th floor myrtle side except for room 516
|
Rough-in | 11/3/2016 | 11/4/2016 | 11/4/2016 | A | PART |
Chad Schwendiman
|
|
|
Inspection request for Rm 407, shaft on 5th Floor Myrtle side of building, and corridor on 4th floor Capital side of building. Please contact job lead, Larry, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - room 407 okay to cover, cooridoor ceiling on 4th floor capitol side okay to cover. okay to cover mechanical shafts on 5th floor east of elevator lobby
|
Rough-in | 11/1/2016 | 11/2/2016 | 11/2/2016 | A | PART |
Ben Livingston
|
|
|
Request for cover inspection 4th Floor Capital side of building. Please contact job lead, Larry ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery 407 gas valve for fireplace no access' rest of rooms on capital side ok
|
Rough-in | 10/31/2016 | 10/31/2016 | 10/31/2016 | P | PART |
Chad Schwendiman
|
|
|
Inspection request for corridor of 3rd floor Capitol side of the building and 4th Floor Myrtle side of the building. Please contact Larry ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - okay to cover cooridoor ceilings on 4th floor myrtle side, and 3rd floor capitol side
|
Rough-in | 10/26/2016 | 10/27/2016 | 10/27/2016 | P | PART |
Chad Schwendiman
|
|
|
Inspection request for grease duct 2-3 levels. Rest of the rooms 4th floor Myrtle side of the building. Please contact job lead, Larry, ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - okay to cover grease duct in the shaft on the 2nd and 3rd floors. okay to cover guest rooms on 4th floor except for 403, and 412
|
Conference | 10/24/2016 | 10/24/2016 | 10/24/2016 | P | PART |
Chad Schwendiman
|
|
|
Inspection request for cover 4th floor Myrtle rooms. Please contact lead, Larry, ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - Okay to cover ceilings in rooms 418 thru 430
|
Rough-in | 10/21/2016 | 10/21/2016 | 10/21/2016 | P | PART |
Chad Schwendiman
|
|
|
Request for inspection on 3rd corridor grease duct shaft and rooms on 4th floor myrtle side of the building. Please contact job lead, Larry ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - okay to cover 3rd floor cooridoor. 4th floor not ready, and grease duct missing supports and banding
|
Rough-in | 10/20/2016 | 10/20/2016 | 10/20/2016 | P | PART |
Chad Schwendiman
|
|
|
Inspection request for Capital side 4th Floor and grease duct shaft. Please contact job lead Larry, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - okay to cover mechanical shafts on the 4th floor except for the grease duct shaft. 2nd layer of grease duct fail. need to protect where the unistrut passes through the fire wrap, need a 3rd layer of fire wrap over lapping the ul listed zero clearance shell and the 2nd layer of fire wrap 6"
|
Rough-in | 10/19/2016 | 10/19/2016 | 10/19/2016 | P | CANC |
Chad Schwendiman
|
|
|
Inspection request for 2nd layer wrap on grease duct. Please contact job lead, Larry ###-####, with any questions or concerns. Phone #: ###-#### >> Inspection requested via web by Heather Gransbery Inspection cancelled from web by: Heather Gransbery
|
Rough-in | 10/17/2016 | 10/17/2016 | 10/17/2016 | P | PART |
Chad Schwendiman
|
|
|
Inspection request for 1st layer wrap on grease duct. Please contact job lead, Larry, ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - 1st layer of fire wrap okay on both grease ducts in the shaft.
|
Rough-in | 10/14/2016 | 10/17/2016 | 10/17/2016 | A | PART |
Chad Schwendiman
|
|
|
Request for cover inspection 3rd floor. Please contact office at ###-####, Heather with any questions or concerns. Phone #: ###-#### Inspection requested via web by HeatherGransbery - okay to cover 3rd floor cooridoor on the myrtle side of the building
|
Rough-in | 10/13/2016 | 10/14/2016 | 10/14/2016 | P | PART |
Chad Schwendiman
|
|
|
Request for cover inspection 3rd floor. Please contact job lead, Larry Halbert, ###-####, with any questions or concerns. Inspection requested via web by Heather Gransbery - okay to cover 3rd floor capitol side guest rooms
|
Rough-in | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | NR |
Chad Schwendiman
|
|
|
Request for cover inspection of 3rd floor. Please contact job lead, Larry, ###-#### with any questions or concerns. Inspection requested via web by Heather Gransbery - 3rd floor capitol south side still not ready
|
Rough-in | 10/12/2016 | 10/13/2016 | 10/13/2016 | A | PART |
Chad Schwendiman
|
|
|
Request for cover inspection of entire 3rd floor. Please contact job lead, Larry Halbert, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - 3rd floor capitol side okay to cover the lids on the north side of the cooridoor
|
Rough-in | 10/12/2016 | 10/13/2016 | 10/12/2016 | P | CANC |
Chad Schwendiman
|
|
|
Request for cover inspection of 3rd floor. Please contact job lead, Larry, ###-#### with any questions or concerns. Phone #: ###-#### >> Inspection requested via web by Heather Gransbery Inspection cancelled from web by: Heather Gransbery
|
Rough-in | 10/11/2016 | 10/11/2016 | 10/11/2016 | P | FAIL |
Chad Schwendiman
|
|
|
Inspection request for 2nd and 3rd floor shafts. Please contact job lead, Larry, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - Grease duct is covered up and was never approved to be covered. UL listed grease duct is not installed per manufacture's installation instructions, & specifications.
|
Rough-in | 10/7/2016 | 10/7/2016 | 10/7/2016 | P | PART |
Chad Schwendiman
|
|
|
Larry// ###-####// cover inspection for the 2nd floor - okay to cover hallway ceilings on the 2nd floor
|
Rough-in | 9/26/2016 | 9/26/2016 | 9/26/2016 | P | PART |
Chad Schwendiman
|
|
|
Cover inspection request for 2nd fl Capital side of the building. Cover inspection 3rd fl Myrtle side of the building. Please contact job lead Larry Halbert ###-#### with any questions or concerns Phone #: ###-#### Inspection requested via web by Heather Gransbery - okay to cover soffits on 2nd floor capitol side of the building, need duct smoke detectors installed on 3rd floor myrtle side
|
Rough-in | 9/15/2016 | 9/15/2016 | 9/15/2016 | P | PART |
Chad Schwendiman
|
|
|
R/I cover inspection 2nd fl Capital side of the building. Please contact job lead, Larry Halbert, ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - okay to cover womens bathroom ceiling on 2nd floor. Need access doors and retaining angles on fire damper in mens bathroom
|
Rough-in | 9/12/2016 | 9/12/2016 | 9/12/2016 | P | PART |
Chad Schwendiman
|
|
|
Okay to cover guest room ceilings on 2nd floor myrtle side of the building
|
Rough-in | 9/1/2016 | 9/2/2016 | 9/2/2016 | A | PART |
Chad Schwendiman
|
|
|
Cover inspection for 2nd floor, Myrtle side of building. Please call Larry Halbert with any questions ###-####. Phone #: ###-#### Inspection requested via web by Bailey Esposito - okay to cover fireplace vents on 2nd floor myrtle side of the bldg
|
Rough-in | 8/31/2016 | 8/31/2016 | 8/31/2016 | P | PART |
Chad Schwendiman
|
|
|
R/I inspection request for 2nd floor cover. Myrtle side of building. Please contact job lead, Larry, ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - Okay to cover the fireplace vent soffits in the 2nd floor north side of the myrtle wing only.
|
Rough-in | 8/25/2016 | 8/26/2016 | 8/26/2016 | P | FAIL |
Chad Schwendiman
|
|
|
R/I inspection request for 2nd and 3rd floor, Myrtle side of the building. Please contact job lead, Larry Halbert, with any questions or concers ###-####. Phone #: ###-#### Inspection requested via web by Heather Gransbery - need screws in retaining angles of fire/smoke dampers per manufactures installation instructions, need access doors for smoke/fire dampers. Need protection for fire partition between guest room where fresh air duct passes through.
|
Rough-in | 8/24/2016 | 8/25/2016 | 8/25/2016 | P | CANC |
Chad Schwendiman
|
|
|
R/I Inspection request for 3rd floor, Mrytle St side of building. Please contact job lead, Larry Halbert, with any questions or concerns. ###-#### Phone #: ###-#### >> Inspection requested via web by Heather Gransbery Inspection cancelled from web by: Heather Gransbery
|
Conference | 8/24/2016 | 8/24/2016 | 8/24/2016 | A | DONE |
Chad Schwendiman
|
|
|
Contractor request for walk through for site inspection. Please contact job lead, Larry Halbert, ###-#### with question or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - walked through with Larry and went over the process for inspecting the fire dampers, and fire/smoke dampers.
|
Rough-in | 7/20/2016 | 7/21/2016 | 7/21/2016 | P | PART |
Chad Schwendiman
|
|
|
R/I inspection request for cover on Capitol side of building, 1st Fl. Please contact job lead Larry Halbert, ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery - 1st floor okay including sealer on b-vent
|
Rough-in | 7/18/2016 | 7/20/2016 | 7/20/2016 | P | CANC |
Chad Schwendiman
|
|
|
R/I inspection request for cover on Capitol side of building, 1st Fl. Please contact job lead Larry Halbert, ###-#### Phone #: ###-#### >> Inspection requested via web by Heather Gransbery Inspection cancelled from web by: Heather Gransbery
|
Rough-in | 7/15/2016 | 7/18/2016 | 7/18/2016 | P | PART |
Chad Schwendiman
|
|
|
R/I inspection request. First floor grease duct, Capital side of the building. Please contact job lead, Larry Halbert ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - rough in on 1st floor ductwork pass. need to seal b-vent pipe for hrv on 1st floor still.
|
Rough-in | 6/27/2016 | 6/29/2016 | 6/28/2016 | A | CANC |
Chad Schwendiman
|
|
|
R/I inspection on podium. Please contact job lead Larry Halbert, ###-#### with any questions or concerns. Phone #: ###-#### >> Inspection requested via web by Heather Gransbery Inspection cancelled from web by: Heather Gransbery
|