Permit Information
Permit NumberMEC16-02913
StatusFinaled
Name TML LLC
Site Address 918 W IDAHO ST
Project NameAthlos Headquarters - Phase 3
Customer Number21513
ePlanReviewNo
Description
Alteration: Furnish and install water source heat pumps,energy recover units,exhaust fans,electric heater and RGD;s.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final6/16/20176/16/20176/16/2017PPASS
DetailsChad Schwendiman
Contact Stan ###-#### or Dan ###-#### Phone #: ###-#### Inspection requested via web by Dan Flaherty
Final6/14/20176/15/20176/15/2017AFAIL
DetailsChad Schwendiman
The owner wants us to call for this Final.
Contact Stan ###-#### or Dan ###-#### Phone #: ###-#### Inspection requested via web by Dan Flaherty - Still haven't recieved the air balance report. all other correction completed
Final5/24/20175/26/20175/26/2017AFAIL
DetailsChad Schwendiman
Final Mechanical Phone #: ###-#### Inspection requested via web by Kim Adams - Missing angles on firedampers 1st. floor and mezzanine. Missing door louvers on mechanical room 1st floor. Need to complete condensate drains on mezzanine units. Parking garage exhaust fan not running. Need a copy of air balance report from owner, waiting for them to email it to me.
Rough-in4/12/20174/12/20174/12/2017PCANC
DetailsChad Schwendiman
rough in inspection for the second floor ceiling on North side. Francisco is the contact Phone #: ###-#### Inspection requested via web by Kim Adams
Rough-in3/28/20173/28/20173/28/2017PPART
DetailsChad Schwendiman
temporary occupancy inspection Phone #: ###-#### Inspection requested via web by Kim Adams - Temporary occupancy okay for 2nd and 4th floors only
Final3/23/20173/23/20173/23/2017PFAIL
DetailsChad Schwendiman
Looking for a Temp Occupancy for 2nd and 4th floor.
Contact Francisco ###-#### Phone #: ###-#### Inspection requested via web by Dan Flaherty - garage mechanical shaft not complete, no power to fire/smoke dampers on ERV on 2nd floor.
Rough-in3/21/20173/22/20173/22/2017APART
DetailsChad Schwendiman
rough in inspection for the garage exhaust Phone #: ###-#### Inspection requested via web by Kim Adams - okay to cover parking garage exhaust duct on mezzanine, and 2nd floor. need to see framing around dampers on 1st floor and 3rd floor
Rough-in3/17/20173/20/20173/20/2017APART
DetailsChad Schwendiman
a rough in inspection for the fluid cooler duct Phone #: ###-#### Inspection requested via web by Kim Adams - okay to cover cooling tower duct.
Rough-in3/2/20173/3/20173/3/2017APART
DetailsChad Schwendiman
in inspection for ceiling of the mezzanine Phone #: ###-#### Inspection requested via web by Crystal Grant - okay to cover gris ceiling on mezzanine, okay to cover duct in north west shaft on 2nd floor
Conference2/28/20172/28/20172/28/2017ADONE
DetailsChad Schwendiman
Walk job to see whats needed for temporary occupancy -
1. Fire, and Fire/Smoke dampers installed in openings, or opening temporarily protected to meet the same rating as required for dampers (1hr, 2hr, ect.)
2. The ERV’s that serve the area being occupied need to be complete, and operational to provide ventilation/exhaust air to that area.
3. The parking garage exhaust need to be completed and operational prior to being able to occupy the garage.
4. The boiler needs to be operational to provide heat to the occupied areas.
5. The heat pumps in the occupied area need to be complete and operational to provide heat to the areas.
6. The issues with the boiler venting need to be resolved. (this is Mountain West Mechanicals issue)
Conference2/23/20172/24/20172/24/2017ADONE
DetailsChad Schwendiman
Please call Stan when you are ready to coordinate with structural inspector as well. Phone #: ###-#### Inspection requested via web by Crystal Grant - meet on site to discuss fire/smoke dampers in shafts
Rough-in2/16/20172/17/20172/17/2017APART
DetailsChad Schwendiman
second floor Phone #: ###-#### Inspection requested via web by Crystal Grant - okay to cover ceilings in rooms except for 215, 216, 229
Rough-in1/27/20171/27/20171/27/2017PPART
DetailsChad Schwendiman
2nd floor rough in Phone #: ###-#### Inspection requested via web by Crystal Grant - okay to cover rooms 220, 223, 231-244, 248
Rough-in1/17/20171/18/20171/17/2017ACANC
DetailsChad Schwendiman
Shaft inspection contact Francisco ###-#### Phone #: ###-#### Inspection requested via web by Dan Flaherty
Rough-in1/17/20171/17/20171/17/2017PFAIL
DetailsChad Schwendiman
Shaft inspection Phone #: ###-#### Inspection requested via web by Crystal Grant - need installation instructions for fire/smoke dampers
Rough-in12/5/201612/5/201612/5/2016PPASS
DetailsTroy James
mezzanine unit numbers 6, 7 and 8 Phone #: ###-#### Inspection requested via web by Crystal Grant
ok to cover ducts at mezzanine from service elevator to the east. Three trunck lines with branches.
Rough-in11/16/201611/16/201611/16/2016PPART
DetailsBen Livingston
soffits on the first floor Phone #: ###-#### Inspection requested via web by Crystal Grant
1st floor soffits ok for cover
Rough-in10/6/201610/7/201610/7/2016APART
DetailsChad Schwendiman
Mezzanine restrooms. Phone #: ###-#### Inspection requested via web by Crystal Grant - okay to cover bathroom ceilings
Rough-in9/30/201610/3/201610/3/2016APART
DetailsChad Schwendiman
2nd floor cover inspection Phone #: ###-#### Inspection requested via web by Crystal Grant - okay to insulate duct work on 2nd floor
Rough-in9/27/20169/27/20169/27/2016PPART
DetailsChad Schwendiman
Francisco-3rd floor restrooms Phone #: ###-#### Inspection requested via web by Crystal Grant -okay to cover 3rd floor bathroom ceiling's
Rough-in9/22/20169/22/20169/22/2016PPART
DetailsChad Schwendiman
Second Floor bathrooms Phone #: ###-#### Inspection requested via web by Crystal Grant - okay to cover 2nd floor bathroom ceilings
Rough-in8/4/20168/4/20168/4/2016PPART
DetailsChad Schwendiman
Kyle/4th floor bathrooms Phone #: ###-#### Inspection requested via web by Crystal Grant okay to cover ceilings in 4th floor bathrooms
Rough-in8/1/20168/1/20168/1/2016PCANC
DetailsChad Schwendiman
Kyle/4th floor restrooms. Phone #: ###-#### Inspection requested via web by Crystal Grant - Building permit has not been issued