Final | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | PASS |
Chad Schwendiman
|
|
|
Final Mechanical Inspection - Please contact Jim Brown. TAB Report to be emailed to Chad S. and Bill V. Phone #: ###-#### Inspection requested via web by Melissa Kaae
|
Rough-in | 9/23/2016 | 9/26/2016 | 9/26/2016 | P | PASS |
Chad Schwendiman
|
|
|
Rough-in cover. Onsite contact: Jim Brown. Phone #: ###-#### Inspection requested via web by Melissa Kaae - Okay to cover celings
|
Rough-in | 9/23/2016 | 9/26/2016 | 9/23/2016 | A | CANC |
Chad Schwendiman
|
|
|
Rough-in cover. Onsite contact: Jim Brown. Phone #: ###-#### >> Inspection requested via web by Melissa Kaae Inspection cancelled from web by: Melissa Kaae
|
Rough-in | 9/21/2016 | 9/22/2016 | 9/22/2016 | A | PASS |
Chad Schwendiman
|
|
|
Light test inspection for exhaust fan connection on the roof. Please contact Jim Brown. Phone #: ###-#### Inspection requested via web by Melissa Kaae - light test pass for grease duct on the roof
|
Rough-in | 9/21/2016 | 9/21/2016 | 9/21/2016 | P | FAIL |
Chad Schwendiman
|
|
|
The venting for the boilers installed in the VRT space in the basement exceeds the manufactures total lenth allowed, the manufacture also calls out for the vent to slope up at a 1/4" per foot from the boilers to the termination location
|
Rough-in | 9/15/2016 | 9/15/2016 | 9/15/2016 | P | PASS |
Chad Schwendiman
|
|
|
2nd Layer Grease wrap inspection, please contact Jim Brown. Phone #: ###-#### Inspection requested via web by Melissa Kaae - 2nd layer of fire wrap pass
|
Rough-in | 9/9/2016 | 9/13/2016 | 9/13/2016 | A | PART |
Chad Schwendiman
|
|
|
Grease duct 1st layer grease wrap inspection 1st Floor, requesting to be first inspection of the day if possible, thanks. Please contact Jim Brown. Phone #: ###-#### Inspection requested via web by Melissa Kaae - 1st layer of fire wrap okay
|
Rough-in | 9/9/2016 | 9/12/2016 | 9/12/2016 | A | PART |
Chad Schwendiman
|
|
|
Grease duct light test inspection 1st Floor, requesting to be first inspection of the day if possible, thanks. Please contact Jim Brown. Phone #: ###-#### Inspection requested via web by Melissa Kaae - light test pass from existing grease duct stubbed into the space to the hood connection
|
Conference | 8/29/2016 | 8/30/2016 | 8/30/2016 | A | DONE |
Chad Schwendiman
|
|
|
On roof to look at final location of exhaust fan. Onsite contact: Pat Nichols. Phone #: ###-#### Inspection requested via web by Melissa Kaae - The location of the fan is acceptable
|