Final | 7/16/2018 | 7/16/2018 | 7/16/2018 | P | PASS |
Brian Scoles
|
|
|
final ok
|
Final | 7/9/2018 | 7/10/2018 | 7/10/2018 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- PVC and ABS piping needs to be covered with plenum rated material, pipe insulation is not a rated assembly- plumbing inspector will take care of this on his permit when called in for inspection- flex to registers ok- no ceiling tiles until this inspection passes
|
Rough-in | 6/7/2018 | 6/8/2018 | 6/8/2018 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- need o add 10x10 transfer grills upsair op all rooms except bahroom- insulaion in walls main level needs return air paths for plenum return- pvc in plenum space needs fire wrap or blocked off- ok for grid
|
Rough-in | 5/22/2018 | 5/23/2018 | 5/23/2018 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- R/i and seal ok- ok to cover hard lids, chase around duct and dryer vents only
|