Final | 11/7/2018 | 11/8/2018 | 11/8/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Evans- final ok
|
Rough-in | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- R/I ok- 20lb gas pressure test ok
|
Rough-in | 8/2/2018 | 8/3/2018 | 8/3/2018 | P | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- supply run above front door still needs flex fixed- lineset coming down exterior wall needs fixed- duct work at furnace needs sealed
|
Rough-in | 8/2/2018 | 8/3/2018 | 8/2/2018 | A | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### >> Inspection requested via web by Devony Bullard Inspection cancelled from web by: Devony Bullard
|
Rough-in | 7/31/2018 | 8/1/2018 | 8/1/2018 | A | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard - b vent clearances need 1" upstairs- cant see clearances on b vent downstairs through floor -supply flex downstairs is being pinched by support -need duct seal at furnace -need to see framing finshed upstairs -some flex runs upstairs have sharp bends at the 90 degree turns
|
Pressure Test | 7/31/2018 | 8/1/2018 | 8/1/2018 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- 20lb gas pressure test ok
|