Permit Information
Permit NumberMEC18-03919
StatusFinaled
Name CASPER HEATING & COOLING LLC
Site Address 1318 S OWYHEE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Addition: Installation of a new heating and cooling system and all the material/duct work to go with it
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final11/7/201911/8/201911/8/2019PPASS
DetailsJack Reynolds
Please call me a little bit before you will be heading that way so I can meet you there in case the owner is not there.

Thank you Phone #: ###-#### Inspection requested via web by Geff Blecha
- final ok
Mec-Aging Inspection10/14/201910/14/201910/14/2019 PASS
DetailsJack Reynolds
WIP
Mec-Aging Inspection7/15/20197/15/20197/15/2019 DONE
DetailsJack Reynolds
WIP
Mec-Aging Inspection4/15/20194/15/20194/15/2019 DONE
DetailsJack Reynolds
WIP
Rough-in9/26/20189/26/20189/26/2018APASS
DetailsJack Reynolds
R/I ok
Pressure Test9/25/20189/26/20189/26/2018APASS
DetailsJack Reynolds
Gas pressure test.
Couple misc items.
Please call before son I can meet on site to get you into the house.

Thank you Phone #: ###-#### Inspection requested via web by Geff Blecha
-20lb pressure test ok- 5lb flue pressure test ok
Rough-in9/24/20189/25/20189/25/2018AFAIL
DetailsJack Reynolds
Can you call me to make sure I am here amd can we also scheduale it for mid morning please.

This is for the remainimg rough-in inspection and a gas pressure test.
Troy should have the approval on the Manual J in the morning.
The flue test has already been done and the walk through on the house.


Thank you Phone #: ###-#### Inspection requested via web by Geff Blecha
need b vent clearances- need a double valve open ended tee in gas line for pressure test or discconect gas line from meter
Rough-in9/21/20189/21/20189/21/2018PPART
DetailsChad Schwendiman
Late in the afternoon as possible today

This is a furnace flue pressure test, and possibly a walk through on the rough in to see if it would be ready for the rough in inspection at the same time.
Pressure test on the gas will probably be Monday afternoon.

Thank you
Phone #: ###-#### Inspection requested via web by Geff Blecha - 5lb flue
Conference8/9/20188/10/20188/10/2018ADONE
DetailsJack Reynolds
Please call soI have enough time to make it over there. Phone #: ###-#### Inspection requested via web by Geff Blecha