Information based on query as of Sunday, June 16, 2024.
Permit Information
Permit NumberMEC18-05005
StatusFinaled
Name ADVANCED HEATING & COOLING
Site Address 1290 W MYRTLE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
New: HVAC
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final5/16/20195/17/20195/16/2019APASS
DetailsChad Schwendiman
Final for Pioneer Crossing - Call Lou ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery
Final5/14/20195/15/20195/15/2019AFAIL
DetailsChad Schwendiman
Final for Pioneer Crossing - Please call Lou ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery - Need uv protection on exposed arma flex, Need to remove sheetrock in front of duct heater access
Rough-in5/9/20195/10/20195/10/2019APASS
DetailsChad Schwendiman
Cover for 3rd Floor - Call Lou ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery - okay to cover 3rd floor
Rough-in5/8/20195/9/20195/9/2019AFAIL
DetailsChad Schwendiman
Cover for 4th floor - call Lou ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery - Fan coil unit needs to be moved from above wall. Duct heater needs to be moved so wall does not interfer with access panel
Rough-in4/30/20195/1/20195/1/2019APASS
DetailsChad Schwendiman
Cover inspection for 1st floor. Please call Lou at ###-#### prior to arrival. Phone #: ###-#### Inspection requested via web by Heather Gransbery - Okay to cover 1st floor grid ceiling
Rough-in4/25/20194/26/20194/26/2019PPASS
DetailsChad Schwendiman
Cover for 2nd floor call Lou ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery - 2nd floor okay to cover grid ceiling
Rough-in3/8/20193/8/20193/8/2019PPASS
DetailsBen Livingston
Re-inspection - cover for 5th floor bathrooms. Call Daryl ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery
5th floor restroom okay
Rough-in3/7/20193/8/20193/8/2019AFAIL
DetailsBen Livingston
Cover for 5th floor bathroom. Call Daryl Hulse ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery
5th floor fire smoke damper angle not to manufactures instalation instructions
Rough-in3/5/20193/6/20193/6/2019APASS
DetailsChad Schwendiman
Smoke/Fire damper inspection - call Daryl ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery - Expansion clearance okay on fire/smoke dampers coming out of the shaft on the 2nd-5th floors.
Rough-in2/21/20192/22/20192/22/2019APASS
DetailsChad Schwendiman
5th floor bathroom for insulation, call Daryl ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery - Okay to insulate ductwork in 5th floor bathroom
Rough-in2/7/20192/7/20192/7/2019PPASS
DetailsJack Reynolds
Trim smoke fire dampers 3rd ; 4th floor bathrooms - call Daryl ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery
- 3rd and 4th floor smoke fire damper trim ok
- bathrooms on 3rd and 4th floor ceiling cover ok
Rough-in2/6/20192/7/20192/7/2019APART
DetailsJack Reynolds
Cover for 3rd and 4th floor bathrooms Phone #: ###-#### Inspection requested via web by Heather Gransbery
- need to see trim around fire dampers on 3rd and 4th floor before cover of bathrooms
Rough-in2/4/20192/5/20192/5/2019APASS
DetailsBen Livingston
4th floor bathroom for insulation - please call Daryl ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery
4th floor bathroom duct seal
Conference2/5/20192/5/20192/5/2019PFAIL
DetailsBen Livingston
4th floor bathroom for insulation - please call Daryl ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery
4th 3rd and 2nd floor fire smoke dampers need tobe installed per manufactures instruction
Rough-in1/30/20191/31/20191/31/2019APART
DetailsBen Livingston
cover for 2nd floor bathroom. Phone #: ###-#### Inspection requested via web by Heather Gransbery
2nd floor bathroom okay, 2nd floor fire damper framing clearence okay
Rough-in1/25/20191/28/20191/28/2019AFAIL
DetailsBen Livingston
2nd floor bathrooms cover, 3rd floor bathrooms insulation. Please call Daryl ###-####. Phone #: ###-#### Inspection requested via web by Heather Gransbery
2nd and 3rdfloor duct seal okay, 2nd floor insulation and lids not rdy for cover, firesmoke dampers 2nd and 3rd floor need to be framed in per installation instructions
Rough-in1/18/20191/22/20191/22/2019APASS
DetailsChad Schwendiman
2nd floor bathroom and 1st floor cover chase, call Daryl ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery - Okay to cover 1st floor shaft, okay to insulate duct work in 2nd floor bathrooms
Rough-in1/14/20191/15/20191/15/2019APASS
DetailsChad Schwendiman
Cover for 1st floor bathroom. Please call Daryl with questions ###-####. Phone #: ###-#### Inspection requested via web by Heather Gransbery - Okay to cover 1st floor bathrooms
Rough-in12/27/201812/28/201812/28/2018APASS
DetailsTroy James
Bathroom Inspection, please call Derek Rome ###-####. Phone #: ###-#### Inspection requested via web by Heather Gransbery
Okay to insulate the ducts at first floor restrooms.
Rough-in12/12/201812/12/201812/12/2018APART
DetailsChad Schwendiman
Insulation inspection for Pioneer Crossing - Call Derek Rome ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery - Okay to insulate make-up air loop on 1st floor and shaft duct work