Final | 1/2/2019 | 1/3/2019 | 1/3/2019 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Robin Cox- final ok- card signed
|
Final | 12/28/2018 | 12/31/2018 | 12/31/2018 | A | PART |
Brian Scoles
|
|
|
air balance report should be on site. if you need, i will email to you Phone #: ###-#### Inspection requested via web by Robin Cox- all equipment needs set and tethered- need to seal MAU ducting on roof weather tight missing seems and corners- air balance ok- temp occupancy ok- will final this permit out after other mech inspections are completed and correction is made- rest is good
|
Rough-in | 12/13/2018 | 12/14/2018 | 12/14/2018 | A | PASS |
Brian Scoles
|
|
|
cover Phone #: ###-#### Inspection requested via web by Robin Cox- R/I ok- ceiling space registers flex and ducting ok to cover
|
Rough-in | 12/6/2018 | 12/6/2018 | 12/6/2018 | P | PASS |
Brian Scoles
|
|
|
mau duct seal ok- ok to insulate- 2nd layer firewrap ok- ok for ceiling grid
|
Rough-in | 12/2/2018 | 12/3/2018 | 12/3/2018 | A | PASS |
Brian Scoles
|
|
|
light test for grease duct. please contact Robin to coordinate time as we are not on site. thanks, Robin 208*890*4261 Phone #: ###-#### Inspection requested via web by Robin Cox- light test pass- ok for first layer
|
Rough-in | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | PASS |
Brian Scoles
|
|
|
Duct seal inspection Phone #: ###-#### Inspection requested via web by Robin Cox- seal on supply r/a and exhaust duct ok- ok for insulation- insulation above hard lids ok- ok to sheetrock hard lids only- still needs hood and MAU duct inspected when installed
|
Rough-in | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | PART |
Brian Scoles
|
|
|
duct seal above sheetrock lids Phone #: ###-#### Inspection requested via web by Robin Cox- seal on exhaust and supply duct ok above bath rooms- ok to insulate- will look at insulation on next R/I inspection
|