Permit Information
Permit NumberMEC18-06023
StatusFinaled
Name FRANKLIN BUILDING SUPPLY
Site Address 3061 N LINDA VISTA LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Per Fixture Install ONLY: Install one gas fireplace and one wood/pellet stove
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/18/20197/19/20197/19/2019APASS
DetailsBrian Scoles
Mechanical Gas fireplace Final inspection
Please call Jon @ ###-#### when headed that way. Phone #: ###-#### Inspection requested via web by Dan Otero- gas fireplace ok- wood stove in basement ok, removing mantel and not installing one per conversation with general contractor stone on wall to ceiling
Final7/10/20197/10/20197/10/2019PFAIL
DetailsBrian Scoles
Mechanical Gas fireplace final inspection
Manual in kitchen drawer
Please call Jon @ ###-#### when headed that way. Phone #: ###-#### Inspection requested via web by Dan Otero- gas fireplace ok- wood stove downstairs needs combustible mantel installed per manufacture installation instructions height to low
Final7/3/20197/3/20197/3/2019PFAIL
DetailsBrian Scoles
Mechanical Gas fireplace final inspection
Please call Jon @ ###-#### when headed that way.
Phone #: ###-#### Inspection requested via web by Dan Otero- need installation instruction for wood fireplace downstairs onsite none could be found did find ones for gas fireplace- called number listed no answer
Rough-in1/25/20191/28/20191/28/2019APASS
DetailsBrian Scoles
1 gas fireplace 1 wood stove R/I ok
Rough-in1/25/20191/25/20191/25/2019PPART
DetailsBrian Scoles
framing needs complete- builder will have ready monday- i rescheduled for AM inspection
Rough-in1/24/20191/25/20191/25/2019APART
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Dan Otero- R/I basement and first floor ok to cover talked with builder onsite- crew there finishing 2nd floor- i will schedule afternoon inspection today and look at 2nd floor
Rough-in1/16/20191/16/20191/16/2019PPART
DetailsBrian Scoles
Partial inspection. We were not able to penetrate the roof for safety reasons. We will be back to finish when roof is not slick. Phone #: ###-#### Inspection requested via web by Dan Otero- framing needs completed- 4" and 6" pipes need to be seucured/strapped in chase- need to finish roof penetrations- need to finish fire caulking- flue needs clearance to combustibles second floor chase and supported- all piping needs supported to manufactures ionstallation instructions- ok to cover rest of house excluding 2nd floor attic space and chases on all levels around fireplace- talked with building inspector about this he is aware
Rough-in1/15/20191/15/20191/15/2019PCANC
DetailsBrian Scoles
Phone #: ###-#### >> Inspection requested via web by Dan Otero Inspection cancelled from web by: Dan Otero
Rough-in12/19/201812/20/201812/20/2018APART
DetailsBrian Scoles
We would appreciate a partial inspection to inspect the gas fireplace. The wood/ pellet stove will be roughed in at a later date. Thank you. Phone #: ###-#### Inspection requested via web by Dan Otero- Gas fireplace R/I ok- contractor waiting on decision on wood/pellet stove per conversation with Dan- will call in inspection when installed- do not cover mechanical sticker left onsite ttil this is completed