Final | 3/25/2019 | 3/26/2019 | 3/26/2019 | A | PASS |
Jack Reynolds
|
|
|
Please contact Jan at ###-#### prior to arrival. Phone #: ###-#### Inspection requested via web by Andrea Grigsby - corrections to furnace flue have been made - final ok
|
Final | 3/20/2019 | 3/22/2019 | 3/22/2019 | P | FAIL |
Jack Reynolds
|
|
|
Contact Client Tonya at ###-####
Phone #: ###-#### Inspection requested via web by Andrea Grigsby - gas line sediment trap ok - furnace flue fail chimney liner needs to terminate properly out of chimney and have motar gaurd in place then liner/ bvent adapter installed as to be able to run the rest of the flue in double wall per installation specs. flue in unconditoned crawl needs b vent installed through out
|
Final | 2/22/2019 | 2/27/2019 | 2/27/2019 | P | FAIL |
Jack Reynolds
|
|
|
Please call ###-#### when you are on your way Phone #: ###-#### Inspection requested via web by Andrea Grigsby - need to installed sediment trap after shut off valve - furnace flue in crawl needs to be installed per vent manufactures spec. Chimney liner needs to terminate properly coming out of the chimney. need to also see a chimney liner/ bvent adapter when changing to to b vent in crawl - need to make sure venting being installed is approved for crawl/ attic -
|