Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberMEC19-02789
StatusFinaled
Name KETO HEATING & COOLING
Site Address 2917 W PARKE CIRCLE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Addition: INSTALL 2 NEW MULTI-PORT H/P''S W/DUCTED HEAD. INSTALL B-VENT FOR W/H, GAS LINES TO STOVE & BBQ; RUN DUCTS FROM EXISTING SYSTEM TO ADDITION; VENT 3 BATH FANS & ADD RANGE HOOD. WILL NEED DUCT TEST & BALANCE
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final11/6/201911/7/201911/7/2019APASS
DetailsJack Reynolds
PLEASE CALL APPRENTICE JAMIE @ # LISTED WHEN EN ROUTE FOR FINAL INSPECTION Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING
- final ok
Final10/30/201910/30/201910/30/2019PFAIL
DetailsJack Reynolds
PLEASE CALL CONTRACTOR NATE @ # LISTED WHEN EN ROUTE FOR FINAL INSPECTION Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING
- need air balance report onsite
- dryer duct needs finished sealed and supported
- storm collar on water heater vent needs pulled down to roof boot
Rough-in7/22/20197/22/20197/22/2019PPASS
DetailsJack Reynolds
PLEASE CALL APPRENTICE JAMIE @ # LISTED B4 HEADING OVER Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING
- R/I ok
Rough-in7/19/20197/19/20197/19/2019PFAIL
DetailsJack Reynolds
PLEASE CALL HVAC TECH PATRICK WHEN EN ROUTE Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING
- Man J needs to reflect whats being installed onsite
Rough-in7/18/20197/18/20197/18/2019PFAIL
DetailsJack Reynolds
ALSO NEED GAS PRESSURE TEST DONE AT SAME TIME! PLEASE CALL CONTRACTOR NATE TAYLOR @ # LISTED WHEN EN ROUTE. Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING
- insulaion sheild needs to maintain 1" clearances
- line set in crawl needs supported and insulation in wall needs repaired
- supply in kitchen needs ducted out of cabinet
- man J doesn't match whats installed on existing system
- supply runs upstairs are said to be 6" runs not 8"
- 3" water heater flue in basement needs 1" clearanes and verify 3" is big enough for water heater
- gas flex in crawl needs supported
- gas line penetrations needs protective tape installed
Pressure Test7/18/20197/18/20197/18/2019PPASS
DetailsJack Reynolds
ALSO NEED GAS PRESSURE TEST DONE AT SAME TIME! PLEASE CALL CONTRACTOR NATE TAYLOR @ # LISTED WHEN EN ROUTE. Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING
- 20lb gas pressure test ok
- tagged meter location