Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberMEC19-02973
StatusFinaled
Name SUPREME HEATING & COOLING INC
Site Address 7447 W EMERALD ST Unit: 110
Project Name 
Customer Number 
ePlanReviewNo
Description
New: Furnish & Install
(1) 4 Ton York RTU with economizer
(1) 3 Ton York RTU with economizer
Includes all accessories per plans
Spiral duct work, includes (10) round supply air diffusers, (3) return air diffusers, & (1) side wall supply air diffuser
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final9/17/20199/18/20199/18/2019APASS
DetailsBrian Scoles
Arcadio-final needed-gas pressure was inspected on MEC19-04124 Phone #: ###-####- final ok card sigmed
Final9/17/20199/17/20199/17/2019AFAIL
DetailsBrian Scoles
Door will be unlocked Phone #: ###-#### Inspection requested via web by Arcadio Martinez- need to secure all new gas piping to new supports on roof- need to add gas piping to valuation of permit and pay fee
Final9/13/20199/16/20199/16/2019PPART
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Arcadio Martinez- need pressure test on whole gas line- need to update valuation for gas piping that wasnt included and pay fee- rest is good- will final out once pressure test is completed and passed- need to secure gas piping on roof to supports on all new piping installed
Rough-in7/11/20197/12/20197/12/2019PPASS
DetailsBrian Scoles
There is a lock box at the front door, code is 208 Phone #: ###-#### Inspection requested via web by Arcadio Martinez- R/I ok- will need to add 10" damper to supply line where sidewall register is by final- need approved prints onsite at final- contractor will be onsite for roof access at final