Final | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | PASS |
Chad Schwendiman
|
|
|
Locking caps have been installed on condenser Phone #: ###-#### Inspection requested via web by Michael Stimpson
|
Final | 12/2/2019 | 12/3/2019 | 12/3/2019 | A | FAIL |
Chad Schwendiman
|
|
|
Door code 1370 Phone #: ###-#### Inspection requested via web by Michael Stimpson - Need locking access caps on refrigeration piping
|
Rough-in | 10/5/2019 | 10/7/2019 | 10/7/2019 | A | PASS |
Jack Reynolds
|
|
|
Stamped Man J will be on site Phone #: ###-#### Inspection requested via web by Michael Stimpson - 5lb and 20lb pressure tests ok - R/I ok - check equipment to man J at final - transfer air for bedrooms at final
|
Rough-in | 10/3/2019 | 10/4/2019 | 10/4/2019 | P | FAIL |
Jack Reynolds
|
|
|
Transfer grilles will be installed after drywall is complete. Butterfly damper installed in-line with fresh air intake to furnace Phone #: ###-#### Inspection requested via web by Michael Stimpson - need stamped man J onsite all other corrections ok
|
Pressure Test | 9/30/2019 | 9/30/2019 | 9/30/2019 | P | PASS |
Jack Reynolds
|
|
|
-20lb gas pressure test ok
|
Rough-in | 9/27/2019 | 9/30/2019 | 9/30/2019 | P | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Michael Stimpson -outside air cant terminate at the asphalt roof and is within 10' of exhausts - need to see transfer/return into each bedroom - range hood venting needs sealed - return ducting needs sealed - 5lb flue pressure test under 5lb - install inert tape at gasline penetration - add another dryer exhaust to permit
|