Final | 11/4/2019 | 11/4/2019 | 11/4/2019 | A | PASS |
Brian Scoles
|
|
|
Jake is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist- final ok
|
Final | 10/30/2019 | 10/30/2019 | 10/30/2019 | P | FAIL |
Brian Scoles
|
|
|
Jake is the contact Phone #: ###-#### Inspection requested via web by stan lillquist- 1- need roof access fire riser room locked up 2- need to remove all ceiling tiles around register to finish R/I inspection on insulation duct and registers and have ladder onsite for inspection
|
Rough-in | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | PASS |
Brian Scoles
|
|
|
Rough in for approval for cover for the bathroom hard lids. Jake is your contact Phone #: ###-#### Inspection requested via web by Kim Adams- R/I ok- 2 exhaust duct in hard lids ok to cover- ok for grid- need to check flex connectors in curb at final on supply and R/A drops
|
Rough-in | 8/30/2019 | 9/3/2019 | 9/3/2019 | A | PART |
Brian Scoles
|
|
|
Jake is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist- seal on exhaust, supply and R/A ok- ok to insulate- needs to see exhaust fans installed before cover- need to verify flex connectors at unit on supply and R/A per drawings
|