Final | 10/2/2019 | 10/2/2019 | 10/2/2019 | A | PASS |
Brian Scoles
|
|
|
final 3 furnaces 3 a/cs ok
|
Final | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | FAIL |
Brian Scoles
|
|
|
THIS INSPECTION IS FOR ROUGHIN/FINAL , PLEASE CALL GLEN WITH ANY QUESTIONS Phone #: ###-#### Inspection requested via web by Yvonne Bowman- need to add wet switch to 3 secondarys at coil location- need uv protection outside at lineset and seal all lineset penetrations weather tight- need to check valuation since 3 furnaces coils and a/cs were installed not RTU as listed
|