Final | 1/31/2020 | 2/3/2020 | 2/3/2020 | A | PASS |
Jack Reynolds
|
|
|
Inspection requested via web by Sheldon Lebow - fireplace final ok
|
Final | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | FAIL |
Brian Scoles
|
|
|
Final inspection for gas fireplace. Phone #: ###-#### Inspection requested via web by Sheldon Lebow- fan doesnt seem to be working and tile above fireplace extremely hot- need pvc sleeve on csst thru appliance-
|
Rough-in | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | PASS |
Jack Reynolds
|
|
|
Inspection requested via web by Sheldon Lebow - fireplace R/I - need CSST sleeved with PVC through equipment per specs by final
|
Pressure Test | 1/15/2020 | 1/22/2020 | 1/22/2020 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Sheldon Lebow - 20lb gas pressure test ok
|
Rough-in | 1/15/2020 | 1/22/2020 | 1/21/2020 | P | CANC |
Jack Reynolds
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sheldon Lebow Inspection cancelled from web by: Sheldon Lebow
|