Final | 4/8/2020 | 4/9/2020 | 4/9/2020 | A | PASS |
Jack Reynolds
|
|
|
Our technician sent you pictures of the final requirements and we changed the permit to reflect the work done. Call ###-#### if you need the pictures resent. Thank you! Phone #: ###-#### Inspection requested via web by Dan McFate - final ok
|
Final | 3/23/2020 | 3/24/2020 | 3/24/2020 | P | PART |
Jack Reynolds
|
|
|
please call 30 minutes before you come thanks Phone #: ###-#### Inspection requested via web by Dan McFate - adjust permit to show work that was done onsite - penetrations need sealed - talked with homeowner about gas line he stated the gas line was deleted from the project and will be done in the future.
|
Rough-in | 2/11/2020 | 2/12/2020 | 2/12/2020 | A | PASS |
Jack Reynolds
|
|
|
Call when you are on the way so we can be sure someone is there Phone #: ###-#### Inspection requested via web by Dan McFate - gas line installation hasn't been started yet. schedule pressure test when ready - permit needs to be adjusted to match work being done - UL listed connector for plastic coated MC cable installed by final
|
Rough-in | 2/10/2020 | 2/11/2020 | 2/11/2020 | P | FAIL |
Jack Reynolds
|
|
|
Call when you are on the way so we can ensure someone is there Phone #: ###-#### Inspection requested via web by Dan McFate - dryer vent needs to be installed in a 2x6 wall as to not smash vent pipe - line set insulation at indoor unit needs finished - line set and condensate in crawl need supported - exhaust fan flex ducting needs rip repaired - gas line has not been installed yet will need to see pressure test when finished - plastic coated MC cable for mini split needs UL listed connector installed by final - adjust permit details to show all items being installed like dryer vent, one exhaust fan, and one A/C for mini split , and gas line which is already in the details
|