Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberMEC20-00592
StatusFinaled
Name ADVANCED HEATING & COOLING
Site Address 11175 W EMERALD ST
Project Name 
Customer Numberadvanced01
ePlanReviewNo
Description
Alteration: Install Mini Splits, Furnace - Paint Booth
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final5/12/20205/12/20205/12/2020PPASS
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Sarah Small- final ok
Card not on site to sign5/12/20205/12/20205/12/2020PPASS
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Sarah Small- card not onsite ti sign
Final5/11/20205/12/20205/12/2020AFAIL
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Sarah Small
1- mini split condenser needs locking caps on service ports
2- condenser needs secured to poly 3" supports
3- need to remove foil tape from b vent near unit heater and install trim ring around b vent and firecaulk
4- need to fire caulk gas line and (4) allthread penetrations in ceiling of garage

left notice front room window
Final4/14/20204/15/20204/14/2020ACANC
DetailsBrian Scoles
Call Don if any questions @ ###-#### Phone #: ###-#### >> Inspection requested via web by Sarah Small Inspection cancelled from web by: Sarah Small
Final2/28/20202/28/20202/28/2020PCANC
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Sarah Small- should have been R/I inspection
Rough-in2/28/20202/28/20202/28/2020PPASS
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Sarah Small- R/I ok- 20lb gas pass sectioned tested
Final2/26/20202/26/20202/26/2020PCANC
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Sarah Small- should have been R/I inspection
Rough-in2/26/20202/26/20202/26/2020PFAIL
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Sarah Small
1- poly vinyl tubing not approved material needs ran in 3/4 inch pvc close to head on center block wall and graded 1/4inch per foot in attic to exterior
2- b vent needs 1" clearance to combustibles at roof and insulation shield installed
3- need open tee between 2 shutoff valves on gas line for pressure test/ retest gas line when fixed

correction notice post in window