Rough-in | 6/15/2020 | 6/15/2020 | 6/15/2020 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Kelton Tackett- R/I ok- insulation ok- need 10mil inert tape exterior penetration at meter location by final
|
Pressure Test | 6/15/2020 | 6/15/2020 | 6/15/2020 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Kelton Tackett- 20lb gas pass tagged meter location
|
Rough-in | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PART |
Brian Scoles
|
|
|
Partial rough in for approval to insulate duct Phone #: ###-#### Inspection requested via web by Kelton Tackett- seal on duct ok- ok to insulate- DO NOT COVER til R/I inspection is completed and gas piping installed and pressure tested- call in when insulation is done and gas piping installed- exhaust fans ok- outside air will need insulated
|