INSP - Conference | 8/12/1998 | 8/12/1998 | 8/12/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - talked to contractor about this job, never was final
|
INSP - Final | 8/12/1998 | 8/12/1998 | 8/12/1998 | P | PASS |
Alan Hauser
|
|
|
08/12/98 350 - final, no card to sign, talked to kim m. and wes w.
|
INSP - Final | 8/12/1998 | 8/12/1998 | 8/12/1998 | P | PASS |
Alan Hauser
|
|
|
08/12/98 350 - final, no card to sign, talked to kim m. and wes w.
|
INSP - Final | 8/31/1995 | 8/31/1995 | 8/31/1995 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/ Rough-in | 8/29/1995 | 8/29/1995 | 8/29/1995 | P | FAIL |
Alan Hauser
|
|
|
08/29/95 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED need to finish gas pipe to rt and finish uncrating it. need to support flex pipe in attic.
|
INSP - Final | 8/25/1995 | 8/25/1995 | 8/25/1995 | P | FAIL |
Alan Hauser
|
|
|
08/25/95 350 - no final all the work was done with out a permit. double
|
INSP - Final | 8/25/1995 | 8/25/1995 | 8/25/1995 | P | FAIL |
Alan Hauser
|
|
|
08/25/95 350 - no final all the work was done with out a permit. double
|