INSP - Final | 8/13/1998 | 8/13/1998 | 8/13/1998 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - not ready for final, no gas piping, and finish condensate at
|
INSP - Final | 8/13/1998 | 8/13/1998 | 8/13/1998 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - not ready for final, no gas piping, and finish condensate at
|
INSP - Final | 8/4/1998 | 8/5/1998 | 8/5/1998 | A | FAIL |
Alan Hauser
|
|
|
08/05/98 350 - no r/i inspections, all tile in and work covered, asked r site with ladder for inspection
|
INSP - Final | 8/4/1998 | 8/5/1998 | 8/5/1998 | A | FAIL |
Alan Hauser
|
|
|
08/05/98 350 - no r/i inspections, all tile in and work covered, asked r site with ladder for inspection
|
INSP - Final | 7/6/1998 | 7/7/1998 | 7/7/1998 | A | PASS |
Alan Hauser
|
|
|
07/07/98 350 - two test ok, 60# test
|
INSP - Final | 7/6/1998 | 7/7/1998 | 7/7/1998 | A | PASS |
Alan Hauser
|
|
|
07/07/98 350 - two test ok, 60# test
|
INSP - Framing/ Rough-in | 7/1/1998 | 7/2/1998 | 7/2/1998 | A | FAIL |
Alan Hauser
|
|
|
07/02/98 350 - no access to roof, correction on comb. air to pool htrs.
|
INSP - Final | 6/15/1998 | 6/15/1998 | 6/15/1998 | P | PART |
Alan Hauser
|
|
|
06/15/98 350 - pt ok for boiler room piping
|
INSP - Final | 6/15/1998 | 6/15/1998 | 6/15/1998 | P | PART |
Alan Hauser
|
|
|
06/15/98 350 - pt ok for boiler room piping
|
INSP - Framing/ Rough-in | 6/11/1998 | 6/12/1998 | 6/12/1998 | A | PART |
Alan Hauser
|
|
|
06/12/98 350 - GAS TEST ONLY--ROBYN ###-#### pt on 2# piping only, still need test on low pressure side and there is combustion air to equipment room
|
INSP - Framing/ Rough-in | 6/10/1998 | 6/11/1998 | 6/11/1998 | A | PART |
Alan Hauser
|
|
|
06/11/98 350 - this is for shell/core only, only 9 r.t.u looked at. gas to be on each tenant improvement. signed temp. on shell
|