BLD-Final | 10/3/2002 | 10/4/2002 | 10/4/2002 | A | PASS |
Dave Hannah
|
|
|
ok for perm occ 10/4/2002 8:50:08 AM
|
Permanent Occupancy | | 10/4/2002 | 10/4/2002 | | DONE |
|
|
|
|
BLD-Final | 10/3/2002 | 10/3/2002 | 10/3/2002 | P | CANC |
Dave Hannah
|
|
|
shrldon; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
FIR-Final | 9/18/2002 | 9/18/2002 | 9/18/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled. Joe Tawney did the life safety inspection. All items on his correction notice have been taken care of 9/19/2002 9:49:08 AM
|
MIS-Aging Inspection | 1/14/2002 | 1/14/2002 | 1/14/2002 | | DONE |
Dave Hannah
|
|
|
work in progress 1/14/2002 11:46:59 AM
|
FIR-Final | 11/14/2001 | 11/14/2001 | 11/14/2001 | A | FAIL |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/14/2001 12:22:48 PM Water motor gong needs repaired
|
FIR-Final | 11/8/2001 | 11/8/2001 | 11/8/2001 | P | FAIL |
Troy Cobbley
|
|
|
###-#### SHELDON Owner to add correct door hardware and test fire alarm system 11/9/2001 9:30:08 AM
|
MIS-Aging Inspection | 11/5/2001 | 11/5/2001 | 11/5/2001 | | DONE |
Dave Hannah
|
|
|
work in progress 11/5/2001 9:12:14 AM
|
MIS-Aging Inspection | 9/3/2001 | 9/3/2001 | 9/3/2001 | | DONE |
Dave Hannah
|
|
|
work in progress 9/4/2001 12:30:12 PM
|
BLD-Conference | 7/3/2001 | 7/3/2001 | 7/3/2001 | A | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 7/3/2001 11:26:48 AM Advised mgr; Sheldon of flue space requirements for rack storage in his bldg
|
FIR-Final | 6/21/2001 | 6/22/2001 | 6/22/2001 | A | FAIL |
Joe Tawney
|
|
|
Final Fail C/N issued 6/27/2001 11:42:15 AM
|
BLD-Final | 6/20/2001 | 6/21/2001 | 6/21/2001 | A | PART |
Dave Hannah
|
|
|
sheldon ###-####
|