BLD-Final | 11/2/2009 | 11/2/2009 | 11/2/2009 | P | PASS |
Bob Archibald
|
|
|
Fence installed. Letter of compliance delivered to manager.
|
DOC - Permit Finaled | | | 11/2/2009 | | DONE |
|
|
|
|
BLD-Conference | 8/18/2009 | 8/18/2009 | 8/18/2009 | P | PART |
Bob Archibald
|
|
|
Site conference with Dan on fencing requirements to enclose the rear area adjacent to the "Carriage House". Dan will speak with the owners and also seek bids to enclose this area with 6' high black decorative fencing similar to fencing at rear of main structure. A response was requested by 8/21/09. I informed dan that if owners were unable to install fencing Boise City would proceed with the fencing and bill the owners the associated cost. Sarah S. informed me that a staff level decision would be initiated and followed by a 10 day appeal period in accordance with the Historic Commisions provisions for installation of the fence.
|
BLD-Conference | 5/7/2009 | 5/7/2009 | 5/7/2009 | A | PART |
Bob Archibald
|
|
|
Phone conference with owners. They are unable to abate the structure by either demolition or engineered stabalization citing the current economic situation, other variables and possibly filing Chapter 11. Discussions with administration on method of proceeding underway. Demoltion costs 5K-40K or engineered stabilization 20K.
|
BLD-Conference | 12/3/2008 | 12/3/2008 | 12/3/2008 | P | PART |
Bob Archibald
|
|
|
Conference with Dan demo bids have been received and application for historic review is pending.
|