Set Bond Amount | 2/28/2020 | 3/13/2020 | 3/13/2020 | A | CANC |
Tom Saunders
|
|
|
check for permits...given more than 30 days...wrong inspection
|
ELE-Conference | 2/14/2020 | 2/28/2020 | 2/28/2020 | A | DONE |
Tom Saunders
|
|
|
check on permits being issued...building permit under review...no electrical permit pulled as of yet...inspection schedule 2 weeks later
|
ELE-Conference | 2/7/2020 | 2/14/2020 | 2/14/2020 | A | PASS |
Tom Saunders
|
|
|
permit check...building permit in process and under review...given 2 weeks to check again for permits
|
MEC-Conference | 2/7/2020 | 2/13/2020 | 2/13/2020 | A | PEND |
Brian Scoles
|
|
|
check on permit issued for mech work- talked with Jose said home needed acca report- they will pull permit once bld permit issued and acca report complete
|
BLD-Conference | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | FAIL |
Mike Jordan
|
|
|
no permit for basement remodel. A correction notice was isseud to obtain building permit for re-roof, new exrerior siding and basement remodel. Also needs all required MEP permits as welll.
|
MEC-Conference | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | DONE |
Brian Scoles
|
|
|
no permit for basement remodel- work done by LMM brothers HVAC- called and talked to Migel he will pul permit for whats they installed- double fees for permit
|
ELE-Conference | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | DONE |
Tom Saunders
|
|
|
no permit for basement remodel...spoke with homeowner...electrical work done with out permits...downstairs kitchen added, bedroom added, and bathroom added...walls and ceiling sheetrocked and finished...homeowner changed stories on who did the work-him, contractor, and finally a buddy...double fee put on address for future permits...given 5 days to start the process
|
PLM-Conference | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | DONE |
Matt Wrobel
|
|
|
no permit for basement remodel met with homeowner talked about needing permits, double permit fee applies
|