INSP-Final | 10/2/2014 | 10/3/2014 | 10/3/2014 | A | PASS |
Craig D. Hanson
|
|
|
System conected and in service. General contractor to repair penatrations in draft stop.
|
INSP-Sprinkler Rough-in/Hydro | 9/24/2014 | 9/25/2014 | 9/25/2014 | A | CANC |
Craig D. Hanson
|
|
|
|
INSP-Sprinkler Rough-in | 8/8/2014 | 8/11/2014 | 8/11/2014 | A | PASS |
Troy Cobbley
|
|
|
1st floor branch line restraints have been installed. Piping is ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 8/8/2014 | 8/8/2014 | 8/8/2014 | P | PART |
Troy Cobbley
|
|
|
Upper level/second floor piping is ok to cover. Can not cover the lower level piping untill a re-inspection verifies that seismic bracing on the branchlines has been completed.
|