INSP-Final | 2/4/2016 | 2/4/2016 | 2/4/2016 | P | PASS |
Katie Marron
|
|
|
Systems test completed satisfactory. Scope of work complete. Permit finaled. System to remain active.
|
INSP-Sprinkler Rough-in/Hydro | 12/8/2015 | 12/8/2015 | 12/8/2015 | P | PASS |
Katie Marron
|
|
|
Hydrostatic test completed satisfactory 12/7/15 (reading at 2:10pm 212 psi, again at 4:14pm 212psi) Rough in inspection completed satisfactory, ok to cover. **To be verified at final** two dry pendants in cooler, 4 dry sidewalls at entrances and one regular sidewall in electrical room. Stubs were present at roughin . Also to be completed riser accessories (FDC, main drain etc)
|
INSP-Sprinkler Rough-in | 11/16/2015 | 11/16/2015 | 11/16/2015 | P | DONE |
Katie Marron
|
|
|
Early Start Inspection on 11/3 for riser stub in. Riser ok to pour floor slab, discussed pouring around a ring for seismic protection. Verified appropriate depth on stub outside of building footing. End of pipe submerged in dirt, unsure if capped, ensure flush is done well at later date.
Initially posted to NAF15-00025 which is alarm permit. Added here to ensure documented appropriately.
|
INSP-Sprinkler Rough-in | 11/13/2015 | 11/16/2015 | 11/13/2015 | P | CANC |
Troy Cobbley
|
|
|
Phone #: 9068792 >> Inspection requested via mobile web by Jessica/Tribal Fire Inspection cancelled via mobile web on Friday, November 13, 2015.
|
INSP-Supply line flush | 11/3/2015 | 11/3/2015 | 11/3/2015 | A | DONE |
Katie Marron
|
|
|
Early Start Inspection for riser stub in. Riser ok to pour floor slab, discussed pouring around a ring for seismic protection. Verified appropriate depth on stub outside of building footing. End of pipe submerged in dirt, unsure if capped, ensure flush is done well at later date.
|