INSP-Final | 3/24/2016 | 3/28/2016 | 3/28/2016 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 3/7/2016 | 3/8/2016 | 3/8/2016 | A | DONE |
Troy Cobbley
|
|
|
Todays inspection request was a conference to discuss the classI electrical at the door to the paint booth. The contractor is to meet the 3' vertical and 5' horizontal requirement for the class I wiring. Also per Scott and my discussion the owner is to provide signage at both sides of the overhead doors (no smoking, no welding, no grinding..ect.) instead of meeting the 6' clearance requirement from exterior walls. The 6' requirement can't be met due to meeting the 30' from property line requirement. All references are derived from the 2012 IFC chapter 24.
|
INSP-Final | 3/2/2016 | 3/3/2016 | 3/3/2016 | A | FAIL |
Katie Marron
|
|
|
Inspection failed. The following items need to be corrected and reinspected: -Plan modification required for installed piping changes. -System Test -Exhaust ventilation per IFC 2404.7.6 specifically meeting 6' from exterior wall -Electrical wiring per IFC 2404.9.4 (explosion proof outlets and exit sign)
4A-40BC fire extinguisher installed during inspection.
|