INSP-Final | 3/6/2017 | 3/6/2017 | 3/6/2017 | P | PASS |
Katie Marron
|
|
|
Scope of work complete. Permit finaled.
|
INSP-Final | 3/3/2017 | 3/3/2017 | 3/3/2017 | P | CANC |
Katie Marron
|
|
|
Not ready for final. Per review report need sprinkler heads in basement approved/listed for current unfinished ceiling.
|
INSP-Sprinkler Rough-in/Hydro | 3/2/2017 | 3/2/2017 | 3/2/2017 | P | PART |
Katie Marron
|
|
|
Hydrostatic test completed satisfactory. Rough-in of basement completed.
*Need to verify if sprinkler head type needs to be changed in basement do to partial finished status*
|
INSP-Sprinkler Rough-in/Hydro | 11/29/2016 | 11/30/2016 | 11/30/2016 | A | PART |
Katie Marron
|
|
|
Rough-in for 1st and 2nd floor completed satisfactory. At time of inspection tenting completed OK.
No hydro complete. Rise still to be installed.
|