INSP-Final | 9/1/2017 | 9/1/2017 | 9/1/2017 | A | DONE |
Troy Cobbley
|
|
|
permit finaled
|
DOC - Permit Finaled | | | 9/1/2017 | | DONE |
|
|
|
as per Troy Cobbley-permit final was done and passed so needs doc finaled to close permit
|
INSP-Supply line flush | 7/12/2017 | 7/13/2017 | 7/13/2017 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Supply line flush | 7/11/2017 | 7/12/2017 | 7/12/2017 | P | CANC |
Troy Cobbley
|
|
|
Not ready for flush yet
|
INSP-Sprinkler Rough-in/Hydro | 7/11/2017 | 7/12/2017 | 7/12/2017 | A | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed. Flush was not ready
|
INSP-Sprinkler Rough-in/Hydro | 7/11/2017 | 7/11/2017 | 7/11/2017 | P | CANC |
Troy Cobbley
|
|
|
Contact is Scott Powada ###-#### he would like to do the Hydro and then the flush 2 hrs later if possible, please let him know if this can be done.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 4/19/2017 | 4/20/2017 | 4/20/2017 | P | PASS |
Troy Cobbley
|
|
|
Met Leroy Anderson on site and gave the underground supply piping the ok to cover.
|