INSP-Final | 10/3/2017 | 10/4/2017 | 10/4/2017 | A | DONE |
Troy Cobbley
|
|
|
Permit finaled. A/v's have been syn'c and as-buiilts submitted
|
DOC - Permit Finaled | | | 10/4/2017 | | DONE |
|
|
|
Final Per Troy Cobbley
|
INSP-Alarm Testing | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | FAIL |
Troy Cobbley
|
|
|
Audibles are not sync't, two strobes did not function, no as-builts, delay egress doors are not tied into fire alarm system yet.
|
INSP-Final | 9/25/2017 | 9/26/2017 | 9/26/2017 | A | FAIL |
Troy Cobbley
|
|
|
There were no city approved plans or small documents on site for inspection. It appears that notification will need to be added in the corridor and in the common Shower Room. Also detection will need to be provided in the same Shower Room. Notification is shown in the corridor as existing but is not there. As-builts or Plan Mods will need to be provided to plan review. He will decide which will need to be provided.
|
INSP-Final | 9/22/2017 | 9/25/2017 | 9/25/2017 | A | CANC |
Troy Cobbley
|
|
|
After ten am Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 8/17/2017 | 8/18/2017 | 8/18/2017 | A | CANC |
Troy Cobbley
|
|
|
Tenting Phone #: ###-#### Inspection requested via web by Sam Ball
|