INSP-Final | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | DONE |
Troy Cobbley
|
|
|
Permit finaled
Correction from RTC Insp to Fire Final Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 7/17/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
DOC - Permit Finaled | | | 7/18/2019 | | DONE |
|
|
|
per troy cobbley
|
INSP-Final | 7/2/2019 | 7/3/2019 | 7/3/2019 | P | FAIL |
Troy Cobbley
|
|
|
Need the backflow preventor certified and the 2" valve removed as per discussion/plans. Address has been corrected.
Contact Andrew Larson ###-#### 30 min prior to Final Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Final | 7/2/2019 | 7/3/2019 | 7/2/2019 | A | CANC |
Troy Cobbley
|
|
|
Contact Andrew Larson ###-#### 30 min prior to Fire Final Insp start please.
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
INSP-Sprinkler Rough-in/Hydro | 6/26/2019 | 6/27/2019 | 6/27/2019 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.
Contact Andrew Larson ###-#### 30 min prior to OH Hydro Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 4/5/2019 | 4/8/2019 | 4/8/2019 | P | CANC |
Jim Page
|
|
|
Inspection request was for NAF18-00086 unit, this request is cancelled.
Contact Andrew Larson ###-#### 30 min prior to RTC insp start please
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 3/8/2019 | 3/11/2019 | 3/11/2019 | P | PASS |
Troy Cobbley
|
|
|
The additional pendant has been added in the third floor mechanical room. Piping can be covered. Head to be shown on as-builts prior to a final sign off.
Contact Andrew larson ###-#### 30 Min prior to RTC Insp start please
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 3/8/2019 | 3/14/2019 | 3/8/2019 | A | CANC |
Troy Cobbley
|
|
|
Contact Andrew Larson ###-#### 30 Min prior to RTC Insp start please
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
INSP-Sprinkler Rough-in | 3/6/2019 | 3/7/2019 | 3/7/2019 | A | PART |
Troy Cobbley
|
|
|
The tenting inspection passed and piping can be covered. However I noticed a third floor closet appears to be used for mechanical. I spoke to Scott in Phoenix Fire office about this potential problem. Sprinkler protection may be required. He is going to follow up.
Andrew Larson Point of contact Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 2/5/2019 | 2/6/2019 | 2/6/2019 | A | PASS |
Troy Cobbley
|
|
|
The rough-in passed for the residence as marked/dated on the city approved plans. Piping can be covered on the first and second floors. Insulation to be installed above the piping on the third floor needs to be verified prior to a cover inspection for the third floor. this will be for Bldg A Lot 4
Tahnk YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|