INSP-Final | 5/31/2019 | 5/31/2019 | 5/31/2019 | P | DONE |
Troy Cobbley
|
|
|
Permit finaled.
Phone #: ###-#### Inspection requested via web by jeremiah robison
|
DOC - Permit Finaled | | | 5/31/2019 | | DONE |
|
|
|
as per Troy Cobbley-doc final-final inspection passed
|
INSP-Sprinkler Rough-in | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | PASS |
Troy Cobbley
|
|
|
hangers added, 4 Heads changed that where painted and heads swapped out to standard response to match. The piping is ok for cover. Phone #: ###-#### Inspection requested via web by jeremiah robison
|
INSP-Sprinkler Rough-in | 5/20/2019 | 5/20/2019 | 5/20/2019 | P | PART |
Troy Cobbley
|
|
|
Sprinkler spacing appears ok for State Fires scope of work but I noted painted heads, missing hangers. It also appears that the existing light fixtures/architectual features are blocking the pendant heads. This issues needs to be addressed now, which will require a plan modification, if it is with-in the building permit scope of work. If outside of the scope of work then the Boise Fire Dept will follow up for corrections.
Phone #: ###-#### Inspection requested via web by jeremiah robison
|