INSP-Final | 9/6/2019 | 9/9/2019 | 9/9/2019 | A | DONE |
Troy Cobbley
|
|
|
Permit finaled
Thank you Phone #: ###-#### Inspection requested via web by jeremiah robison
|
DOC - Permit Finaled | | | 9/9/2019 | | DONE |
|
|
|
Per Troy C and final inspection
|
INSP-Final | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | FAIL |
Troy Cobbley
|
|
|
Two pendant heads are blocked in the southeast lower ceiling/room by surface mounted lights. One pendant in the high is still covered with tape. All other items appear okThank you have a nice day Phone #: ###-#### Inspection requested via web by jeremiah robison
|
INSP-Sprinkler Rough-in/Hydro | 7/16/2019 | 7/17/2019 | 7/17/2019 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed. Overhead rough-in passed. Piping can be covered.
Contact: Leon Taylor Phone #: ###-#### Inspection requested via web by Hunter Fillmore
|
INSP-Sprinkler Rough-in/Hydro | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | CANC |
Troy Cobbley
|
|
|
Conact: Leon Taylor Phone #: ###-#### >> Inspection requested via web by Hunter Fillmore Inspection cancelled from web by: Hunter Fillmore
|
INSP-Sprinkler Rough-in/Hydro | 7/16/2019 | 7/17/2019 | 7/16/2019 | P | FAIL |
Troy Cobbley
|
|
|
Failed hydro-did not maintain pressure. Dropped 20 psi in 2 hours. Not ready for rough in, no small docs or stamped prints on site.
Contact: Leon Taylor Phone #: ###-#### >> Inspection requested via web by Hunter Fillmore
|