INSP-Final | 10/1/2019 | 10/3/2019 | 10/3/2019 | A | DONE |
Troy Cobbley
|
|
|
Permit finaled. RUDY CATIC Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Sprinkler Rough-in | 10/3/2019 | 10/3/2019 | 10/3/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Remaining piping can be covered. Call Jeff if there are questions. Thanks Phone #: ###-#### Inspection requested via web by Jeff Packham
|
DOC - Permit Finaled | | | 10/3/2019 | | DONE |
|
|
|
per troy cobbley
|
INSP-Sprinkler Rough-in | 9/20/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the piping in the east restroom that is ok for cover.
RANDY COURTWRIGHT Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|