Final | 2/15/2001 | 2/15/2001 | 2/15/2001 | A | PASS |
Lee Rice
|
|
|
Scheduled by Inspector: 309 On 2/15/2001 10:10:03 AM
|
Final | 2/14/2001 | 2/14/2001 | 2/14/2001 | P | CANC |
Bill VanDegrift
|
|
|
###-####
|
Final | 2/14/2001 | 2/14/2001 | 2/14/2001 | P | PART |
Lee Rice
|
|
|
Scheduled by Inspector: 309 On 2/14/2001 2:00:05 PM valves tested ok, still have one sink to connect up front 2/15/2001 7:45:20 AM
|
Groundwork | 2/14/2001 | 2/14/2001 | 2/14/2001 | P | CANC |
Lee Rice
|
|
|
Scheduled by Inspector: 309 On 2/14/2001 2:02:38 PM
|
Final | 2/12/2001 | 2/13/2001 | 2/13/2001 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 2/12/2001 5:11:30 PM ###-#### 2/12/2001 5:11:47 PM wont be ready till next week 2/13/2001 9:17:12 AM
|
Final | 2/12/2001 | 2/12/2001 | 2/12/2001 | P | PART |
Bill VanDegrift
|
|
|
FN ERIC --###-#### CELL set all equipment, complete starbucks, test all bfp's, install pvb at hose reel soap disp. 2/12/2001 5:11:02 PM
|
Plumbing Rough-in | 2/2/2001 | 2/5/2001 | 2/5/2001 | P | FAIL |
Bill VanDegrift
|
|
|
conference only ###-#### replace avbs with pvbs and extend 12" above piping on hose reels, turn rps and dcvas so valves are out, provide rp on fish case wash and proofers, move water softenor bypass downstream of rp, label all non-potable water piping, expose airgap in all equipment, rp on beverage mechine in breakroom, set all equipment 2/5/2001 5:25:56 PM
|
Final | 2/1/2001 | 2/2/2001 | 2/1/2001 | P | CANC |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/01/2001 at 13:47:22. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/01/2001 at 15:49:04.
|
Final | 1/12/2001 | 1/16/2001 | 1/16/2001 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 01/12/2001 at 08:36:09. Contact: ###-####. incomplete 1/16/2001 10:03:24 AM
|
Groundwork | 12/7/2000 | 12/8/2000 | 12/8/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/07/2000 at 15:17:52. Contact: ###-####. ti up front center unit 12/8/2000 9:14:44 AM
|
Water and/or Sewer | 11/15/2000 | 11/16/2000 | 11/16/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/15/2000 at 16:15:40. Contact: ###-####. , tests ok, hallway by restrooms r/i ok julery ri ok 11/16/2000 9:41:45 AM 11/16/2000 9:57:00 AM
|
Water and/or Sewer | 11/9/2000 | 11/9/2000 | 11/9/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/09/2000 at 10:17:32. Contact: ###-####.main restroom waste and vents water 11/9/2000 2:29:47 PM
|
Water and/or Sewer | 11/1/2000 | 11/2/2000 | 11/2/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/01/2000 at 16:16:03. Contact: ###-####. restroom area by coolers in back 11/2/2000 10:19:02 AM
|
Plumbing Rough-in | 10/30/2000 | 10/31/2000 | 10/31/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 10/30/2000 water in island ok to cover island 10/31/2000 11:42:58 AM
|
Plumbing Rough-in | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 10/30/2000 fredmeyer debest island waste and vent water leaks 10/30/2000 4:37:09 PM
|
Water and/or Sewer | 10/27/2000 | 10/30/2000 | 10/30/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/27/2000 at 14:54:56. Contact: ###-####. meat prep. area 10/30/2000 9:00:37 AM
|
Water and/or Sewer | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 16:35:54. Contact: ###-####. 10/27/2000 2:32:01 PM floor sin in fish dept ok 10/27/2000 2:32:47 PM
|
Water and/or Sewer | 10/25/2000 | 10/26/2000 | 10/26/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/25/2000 at 16:31:54. Contact: ###-####.
|
Water and/or Sewer | 10/24/2000 | 10/25/2000 | 10/25/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/24/2000 at 16:20:43. Contact: ###-####.
|
Storm Drains | 10/13/2000 | 10/13/2000 | 10/13/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/13/2000 at 10:23:24. Contact: ###-####. trench 10/13/2000 3:04:06 PM drains in graden area should be ok when I get the revised plans 10/13/2000 3:04:30 PM
|
Roof Drains | 10/11/2000 | 10/11/2000 | 10/11/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/11/2000 at 10:43:12. Contact: ###-####. submit revised P-1 to pds for review by plumbing div. and attachment to approved plans. trench drains and backwater valves 10/11/2000 2:21:24 PM
|
Roof Drains | 9/29/2000 | 10/2/2000 | 10/2/2000 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/29/2000 at 15:44:00. Contact: ###-####. regrade roof drain and overflow lines. 10/2/2000 9:06:42 AM
|
Plumbing Rough-in | 9/21/2000 | 9/22/2000 | 9/22/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 10:30:46. Contact: ###-####. w&v test in rstroom 9/25/2000 8:28:38 AM
|
Roof Drains | 9/18/2000 | 9/18/2000 | 9/18/2000 | P | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 09/18/2000 at 11:15:32. Contact: ###-#### .only north side left
|
Groundwork | 9/8/2000 | 9/8/2000 | 9/8/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 10:39:25. Contact: ###-####.two small bathrooms on west end and combo waste and vent by deli. 9/8/2000 4:42:12 PM
|
Groundwork | 9/6/2000 | 9/6/2000 | 9/6/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/06/2000 at 09:26:01. Contact: ###-####. witnessed grease interceptor test. and inspected. told foreman to use gravel all the way up under vent pipe fron interceptor. 9/6/2000 2:46:24 PM
|
Groundwork | 8/31/2000 | 8/31/2000 | 8/31/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/31/2000 at 08:27:26. Contact: ###-####.
|
Groundwork | 8/30/2000 | 8/30/2000 | 8/30/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/30/2000 at 11:22:14. Contact: ###-####.
|
Roof Drains | 8/30/2000 | 8/30/2000 | 8/30/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/30/2000 at 11:22:32. Contact: ###-####.
|
Roof Drains | 8/29/2000 | 8/30/2000 | 8/30/2000 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/29/2000 at 16:24:51. Contact: ###-####.backgrade and lack of support on mainline roofdrain on east side ok. RD on west side not ready. 8/30/2000 2:17:50 PM
|
Groundwork | 8/28/2000 | 8/29/2000 | 8/29/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 8/28/2000
|
Groundwork | 8/28/2000 | 8/28/2000 | 8/28/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/28/2000 at 09:59:44. Contact: ###-####.
|
Groundwork | 8/24/2000 | 8/25/2000 | 8/25/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/24/2000 at 14:30:42. Contact: ###-####.
|
Groundwork | 8/22/2000 | 8/23/2000 | 8/23/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/22/2000 at 16:20:24. Contact: ###-####.
|
Groundwork | 8/16/2000 | 8/17/2000 | 8/17/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/16/2000 at 16:22:48. Contact: ###-####.leaks 8/17/2000 3:07:57 PM
|
Groundwork | 8/17/2000 | 8/17/2000 | 8/17/2000 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 8/17/2000 leaks fixed
|
Groundwork | 8/15/2000 | 8/15/2000 | 8/15/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/15/2000 at 08:39:17. Contact: ###-####. greae line from center of building to running trap and exterior ok with trap downstram of running tap 8/15/2000 5:00:55 PM
|
Groundwork | 8/11/2000 | 8/14/2000 | 8/14/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 14:02:50. Contact: ###-####. combo w&v by south cent 8/14/2000 11:05:17 AM ral restrooms 8/14/2000 11:05:24 AM
|
Groundwork | 8/11/2000 | 8/11/2000 | 8/11/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 11:21:16. Contact: ###-####. nr 8/14/00 12:30:22 PM
|
Groundwork | 7/26/2000 | 7/27/2000 | 7/27/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 15:20:58. Contact: ###-####. rest room southeast 7/27/2000 9:32:56 AM
|
Water and/or Sewer | 7/20/2000 | 7/21/2000 | 7/21/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/20/2000 at 15:36:20. Contact: ###-####. LATE MORNING partial g 7/21/2000 11:34:11 AM w ok 7/21/2000 11:34:15 AM
|
Groundwork | 7/17/2000 | 7/18/2000 | 7/18/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/17/2000 at 15:42:33. Contact: ###-####. late am
|
Groundwork | 7/13/2000 | 7/13/2000 | 7/13/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/13/2000 at 08:12:19. Contact: ###-####. lower end of main lines ok south central core 7/13/00 4:17:57 PM
|
Groundwork | 7/7/2000 | 7/7/2000 | 7/7/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/07/2000 at 09:27:16. Contact: ###-####. deli area gw 7/7/00 2:32:27 PM
|
Groundwork | 6/30/2000 | 6/30/2000 | 6/30/2000 | P | FAIL |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 06/30/2000 at 08:53:28. Contact: ###-####. partial ok on shallow bakery grease area correction on deep grease lines to north to close to footing pads 7/3/00 10:30:49 AM
|